EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Topeka, Kansas. Completed plans call for the renovation of a 62,361-square-foot, one-story above grade educational facility.

As of October 1, 2024, construction had commenced in August 2024. Completion is expected December 2025. All trades have been awarded. The previous solicitation is listed below for reference. The renovation scope for the Summer of 2024 entails demolition of existing CMU partitions and construction of new CMU partitions / doors in special education spaces and update of finishes including ceilings, flooring, paint and casework / countertops. Six (6) science classrooms are to receive updated ceilings, flooring, paint and casework / countertops. Existing lighting throughout the building has already been updated to LED fixtures, any re-work of ceilings should ensure lighting is salvaged for re-use. Loyd Builders is requesting subcontractor bids for the Washburn Middle School - Summer 2024 project in Topeka, KS. Bid Package Includes: Selective Demolition, Unit Masonry, Carpentry, Plastic Laminate Clad Architectural Cabinets with Solid Surface Tops, Doors with Frames and Hardware, Aluminum Entrances and Storefront, Tubular Unit Skylights, Acoustical Panel Ceilings, Resilient Flooring with Carpet, Resinous Flooring, Painting, Visual Display Units, Toilet Accessories with FEC, Safety Padding, Window Treatments, Fire Suppression Modifications, Plumbing, Mechanical, Electrical with Fire Alarm. Construction is expected to start August 2024 and complete by December 2025.

Under Construction

Educational

$1,300,000.00

Public - City

Renovation

29

27

11

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
40
Bidding Soon
596
All Active Projects
262
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

August 15, 2024

img_map_placeholder

5620 SW 61st St, Topeka, KS

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.