BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Caryville, Tennessee. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; swimming pool; and playground / park / athletic field.

Cove Lake State Park Pool Demolition All bids over $100,000 shall include provisions for a payment bond in the amount of twenty-five percent (25%) of the contract price. General Scope of Work 1. The contractor shall install silt fencing around entire area before demo starts. 2. The contractor shall remove the power supply wires from the main panel box to the panel box located in the pool equipment room and from the panel box in the pool equipment room to the panel box in the kiddie pool equipment room. 3. The contractor shall demolish the pool, equipment, walls, equipment rooms and flooring, and pool decking. The pool deck will be sawcut at a marked cold joint on the building side. Caution shall be taken to protect this area and structures. Any damage shall be the contractor’s responsibility to repair. 4. The contractor shall remove all non-concrete, metal and any other non-concrete material debris from state property and properly dispose of off-park within applicable regulations. Concrete shall be broken into 5-inch or less pieces for use by contractor to subbase material for final slope. The contractor shall demo the pool liner by cutting into sections or using equipment to remove and load for disposal. 5. The contractor shall demo any metal found in pool demo site. This metal must be removed from state park property and is up to contractor for disposal off-park. No broken-up aggregate shall be used as backfill if it contains metal or re-bar. 6. The contractor shall compact replacement fill dirt at 1-foot intervals with vibratory roller compaction. It shall be acceptable for the contractor to break aggregate into pieces no more than 5-inches in size and add a layer of broken aggregate at 1-foot intervals. Each foot of fill soil shall have no more than 6-inches of broken aggregate added on top. There shall never be pieces of aggregate more than 5-inches in size added to fill. 7. The contractor shall supply suitable fill material of suitable backfill not containing rock as needed to within 1-foot of grade. The contractor shall supply and compact 1-foot of topsoil for final grade. The finish slope from remaining pool deck section to surrounding area shall be filled and sloped to as close to a 1% slope as possible. 8. The contractor shall demo kiddie pool and its deck 360 degrees around pool location. This includes concrete pad, equipment room, and foundation. All demoed concrete containing metal shall be removed from park property and disposed of properly off site. Page 3 of 4 9. The contractor shall cut and cap the water supply line prior to the entry point into the equipment rooms in sufficient distance to prevent further damage during work. 10. The contractor shall remove the chain-link fence around pool site. The contractor shall re-use the chain-link fence and install it on the side of the building where the pool is being demoed. The contractor shall dispose of any fencing not used off of state property. The contractor shall install new chain-link fencing of the same height if the existing fencing is not reusable. 11. The contractor shall Harley rake all disturbed and filled areas before seeding and straw. Five bales of straw and five pounds of fescue seed per acre shall be broadcast over the entire site at completion of work.

Post-Bid

Swimming Pools

$75,000.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
93
Bidding Soon
810
All Active Projects
352
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2024

March 4, 2024

img_map_placeholder

110 Cove Lake Ln, Caryville, TN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.