BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Greenfield, Indiana. Completed plans call for the renovation of a transportation facility.

Question Deadline 01/22/2024 at 4:00 PM ET 40-01 INTENT OF CONTRACT. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 ALTERATION OF WORK AND QUANTITIES. The Owner reserves, and shall have the right to make, such alterations in the work as may be necessary or desirable to complete the work originally intended in an acceptable manner in accordance with Indiana Code 36-1-12-18. The Engineer shall be and is hereby authorized to make such alterations in the work. Alterations shall not invalidate the contract nor release the surety, and the Contractor agrees to accept payment for such alterations as if the altered work had been a part of the original contract. Alterations of work shall be covered by "Change Orders" issued by the Engineer. Change orders for altered work shall include extensions of contract time where, in the Engineer's opinion, such extensions are commensurate with the amount and difficulty of added work. 40-03 OMITTED ITEMS. The Engineer may, in the Owner's best interest, omit from the work any contract item. The omission of any contract item shall be covered by a written change order. Such omission of contract items shall not invalidate any other contract provisions or requirements. For unit price bids, minor items of work may be omitted, in their entirety, without cause for compensation to the Contractor for any work not performed as a result of the omission. For unit price bids, major items of work may be omitted to twenty five percent (25%) of the original quantity and cost of the item of work without cause for compensation to the Contractor for any work not performed as a result of the omission. The omission of any part of a major item of work in excess of 25% of the original quantity or cost of the item of work, shall be cause for negotiation between the Owner and the Contractor, of either the unit price for the remaining work included in the item, or in the event of total omission, compensation to the Contractor for any profit overhead, or administrative costs associated with the item.

Post-Bid

Transportation Terminals

$10,530,000.00

Public - City

Renovation

49

14

8

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
126
Bidding Soon
1,493
All Active Projects
670
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2024

April 1, 2024

img_map_placeholder

3867 N Aviation Way, Greenfield, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.