BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a swimming pool in Kirkwood, Missouri. Completed plans call for site work for a swimming pool.

**As of March 15th , 2024 project was awarded to Bazan Painting Co. but awarded amount is not available.** The City of Kirkwood (hereafter noted as "the City") is requesting sealed proposals for Kirkwood Aquatic Center Leisure Pool & Lazy River Sandblasting. Qualified Firms (hereafter noted as "Firm") are invited to submit sealed proposals to provide Kirkwood Aquatic Center Leisure Pool & Lazy River Sandblasting for the City of Kirkwood in accordance with the specifications contained herein. General information and instructions to respondents are contained herein. Question Cuttoff Date & Time 1/24/2024 06:00:00 PM (ET) All questions pertaining to this opportunity must be asked via Electronically. The City is not permitted to answer any questions regarding a solicitation via Email or Phone. No Faxed, Hand Delivered, Mailed, or Emailed Responses will be accepted. Any contact by Supplier in regards to this proposal with City personnel other than those defined herein may be considered grounds for dismissal of Supplier's proposal. Leisure Pool - Pool is to be drained and free of debris by others prior to arrival. - Clean up and disposal of all sandblast debris and residue. - Painting of pool with one prime coat and two finish coats of Tnemec 161 catalyzed epoxy in the color white. - Use of silica sand to apply a non-skid texture to the floor up to 18 inches deep and shallower. - Painting of deep water line, bench nosing and drain markings with black epoxy paint. - Patching. Lazy River - Pool is to be drained and free of debris by others prior to arrival. - Clean up and disposal of all sandblast debris and residue. - Painting of pool with one prime coat and two finish coats of Tnemec 161 catalyzed epoxy in the color white. - Use of silica sand to apply a non-skid texture to the top of stair treads - Painting of stair nosings with black epoxy paint. - Patching.

Award

Swimming Pools

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
42
Bidding Soon
824
All Active Projects
321
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

img_map_placeholder

111 S Geyer Rd, Kirkwood, MO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.