Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.
For this project, Contractor shall furnish all material, labor and supervision for the repairs and jetting of sewer drain main for the Navy Gateway Inn & Suites (NGIS), to clear blockages and allow drainage of sewer/sanitary lines. This includes time to get base clearance, mobilize, order & receive material, permits and completeproject, including cleanup & inspection. Project Location: Navy Gateway Inn & Suites, 2450 McHugh Street, Building 3362, Navy Base San Diego, CA 92136. The Magnitude ofthis project is $18,000 - $20,000. 1. Demo/Removal: a. Contractor shall secure the area and install dust barrier protection in work area, to keep demolition debris and dust within the working area during demolition prior to starting any demo work. Contractor shall make all efforts to keep dust/debris from spreading beyond extents of work area. b. Contractor shall remove carpet and saw cut and remove/dispose of select area of concrete in first floor hallway, approximately 3FT X 4FT X (thickness ofslab) for the purpose of accessing the sewer main line running below grade. This select area is identified as being between Room 101 and Laundry Room. See attached floorplan identifying room numbers and laundry facility. c. Contractor shall remove compacted fill to uncover sewer main. During the process of removal and excavation, work site is to be secured against unauthorized personnel, to restrict access to hazards created from hole/opening. Outside of contractor's working hours, the excavation hole shall be covered per EM385-1-1, until backfilled. d. Contractor shall remove the required amount of 6" sewer main to enable installation of the double sweep cleanout. e. Contractor to coordinate work hours and any required outages with NGIS GM. 2. New work/Installation: a. Contractor shall install new double sweep cleanout, including all related components, and brass cleanout plugs. b. Contractor shall backfill and compact around and above sewer main to completely fil excavation to original condition to support new concrete backfill. Contractor shall backfill concrete to same thickness and condition of concrete removed, ensuring finished surface is level and even with adjacent concrete slab. (Replacement installation of carpet to be performed by others.) -Upon completion of this project, it is the responsibility of the contractor to return the area ofwork to its original condition, to include any ofthe surrounding areas disturbed by this work, exterior ground surface material, and fixtures and equipment that are disturbed by but not included in this install. All questions should be submitted in writing via email ONLYto the Contracting Office for official answers. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$20,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2024
March 7, 2024
2450 McHugh St, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Feb 02 2024
San Diego, CA
Bid Date: Feb 08 2024
San Diego, CA
Bid Date: Feb 07 2024
San Diego, CA
Bid Date: Feb 02 2024
San Diego, CA
Bid Date: Mar 22 2024
San Diego, CA
Bid Date: Jan 22 2024
San Diego, CA
--
San Diego, CA
Bid Date: Jan 24 2024
San Diego, CA
Bid Date: Feb 08 2024
San Diego, CA
Bid Date: Jan 24 2024
San Diego, CA
Bid Date: Feb 01 2024
San Diego, CA
Bid Date: Feb 08 2024
San Diego, CA
--
San Diego, CA
Bid Date: Jan 25 2024
San Diego, CA
Bid Date: Feb 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.