BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Rocklin, California. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Contractor agrees to perform the work and to furnish all tools, equipment, apparatus, facilities, labor and material necessary to perform and complete in a good workmanlike manner, all parts of the work as called for in a manner designated in and in strict conformance with the scope of work set forth in Exhibit "A," attached hereto and incorporated herein ("Scope of Work") and the Contract Documents. It is understood and agreed that said tools, equipment, apparatus, facilities, labor and material shall be furnished and said work performed and completed as required in said Scope of Work under the direction and supervision of, and subject to the approval of the District's authorized representative. Contractor's Work shall also be consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the District, any work necessary to correct errors or omissions which are caused by Contractor's failure to comply with the standard of care provided for herein. Work to be completed in accordance with provided plans /drawings; Crack filling per plans using the Riteway Crack Repair System, Acrylic re-surfacing per plans matching existing colors, painting to match existing colors with the addition of yellow pickleball lines. Work is to begin when school is out of session starting June 6, 2024, and is to be completed by August 2, 2024, construction schedule will be approved by the district. District is to spray for weeds per plans. Any wastewater generated by the repairs should be properly collected and legally disposed of. Each bid must conform to the requirements of the Drawings and Specifications, and other documents comprising the Bid Documents. Inquiries regarding the documents and for obtaining the Bid Documents can be made by contacting Mike Stemple, Purchasing and Contract Services Manager at mstemple@rocklinusd.org

Award

Playgrounds / Parks / Athletic Fields

$113,410.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
68
Bidding Soon
1,242
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.