EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Elizabeth, Louisiana. Completed plans call for site work for a water / sewer project.

If Forwarded by Mail, the Sealed Envelope Containing the Bid Must Be Enclosed in Another Envelope Addressed to the Engineer, Meyer, Meyer, Lacroix & Hixson, Inc., 100 Engineer Place, Alexandria, La 71303. The Bidding Documents May Be Examined at the Office of the Engineer: Meyer, Meyer, Lacroix & Hixson, Inc. Telephone (318) 448-0888 100 Engineer Place Alexandria, Louisiana 71303 Each Bidder Must Have an Active Unique Entity Id (Uei) (Sam), as Verified on Www.sam.gov, Prior to the Beginning of Construction. Each Bid Must Be Accompanied by Bid Security Made Payable to Owner in an Amount of 5 Percent of Bidderos Maximum Bid Price and in the Form of a Certified Check, Cashieros Check or a Bid Bond. The Successful Bidder Will Be Required to Obtain a Performance Bond and a Payment Bond Each in the Amount of 100% of the Contract Amount. All Bonds Shall Be Executed by Such Sureties as Are Named in U.s. Department of the Treasury Circular 570. A Bond Signed by an Agent or Attorney-in-fact Must Be Accompanied by a Certified Copy of That Individualos Authority to Bind the Surety. Bidders May Not Withdraw Their Bid Within Forty-five (45) Days After the Actual Date of Opening Thereof. The Owner Reserves the Right to Reject Any and All Bids for Just Cause in Accordance With Louisiana R.s. 38:2214b. The Contractor Shall Begin Mobilization and Procurement of Materials Within Ten (10) Working Days of the Receipt of the Notice to Proceed. This Contract is Subject to the Requirements of the Davis-bacon Act (Dol 29 Cfr Part 5), as Amended. The Contractor is Required to Comply With Wage and Labor Provisions and to Pay Minimum Wages in Accordance With the Schedule of Wage Rates Established by the United States Department of Labor. The Attention of Bidders is Called Particularly to the Requirements for Conditions of Employment to Be Observed and Minimum Wage Rates to Be Paid Under the Contract, Section 3, Segregated Facilities, Section 109, Executive Order 11246, and All Applicable Laws and Regulations of the Federal Government and State of Louisiana and Bonding and Insurance Requirements. Any Person With Disabilities Requiring Special Accommodations Must Contact the Owner No Later Than Seven (7) Days Prior to Bid Opening. Minority and Section 3 Businesses Are Encouraged to Submit Bid Proposals. Any Such Business Enterprise Will Be Afforded Equal Opportunity and Will Not Be Discriminated Against on the Grounds of Race, Color, Sex, National Origin or Disability in Consideration of the Contract Award. In Particular, Bidders Should Note the Required Attachments and Certifications to Be Executed and Submitted Within Ten Days of the Bid Opening.

Bid Results

Water / Sewer

$1,083,637.00

Public - City

Site Work

12

15

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
4
Bidding Soon
188
All Active Projects
95
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Elizabeth, LA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FY 2022 LCDBG Sewer System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.