BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lincoln, Maine. Completed plans call for site work for a water / sewer project.

The Project Includes the Following Work: Installation of Approximately 4,000 Lf of 12, 10, 6 and 8-inch Diameter Ductile Iron Water Main, Hydrants, Gate Valves and Water Services Bids Are Requested for the Following Contract: Taylor Street Water Main Replacement Project Owner Anticipates That the Projects Total Bid Price Will Be Approximately $1,600,000.00. The Project Has an Expected Duration of 120 Days. Bid Shall Be Accompanied by a Bid Security in the Amount of 5% of the Total Bid Price as Outlined in the Instructions to Bidders. Payment and Performance Bonds Will Need to Be Provided at Contract Signing as Described in the Contract Documents. The Owner Reserves the Right to Waive Any Informalities or to Reject Any or All Bids. No Bidder May Withdraw His Bid Within 60 Days After the Actual Date of the Opening Thereof A Certified Check or Bank Draft Payable to the Owner or a Satisfactory Bid Bond Executed by the Bidder and a 12/01/2024, 11:45 Convert Case | Convert upper case to lower case, lower case to upper case and more! https://convertcase.net 3/3 Surety Company in the Amount Equal to Five Percent (5%) of the Bid Shall Be Submitted With Each Bid. No Bid May Be Withdrawn for at Least 60 Days After Receipt of Bids Unless Released by the Owner. Performance and Payment Bonds Are Required at Contract Signing for 100% of the Contract Price Question Deadline 02/06/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Rick Pershken, Project Manager Dirigo Engineering, 2 Dirigo Drive, Fairfield, ME 04937, 207-453-2401 rick@dirigoeng.com Instructions to Bidders. For All Further Requirements Regarding Bid Submittal, Qualifications, Procedures, and Contract Award, Refer to the Instructions to Bidders That Are Included in the Bidding Documents. Build America, Buy America Act (Babaa) Each Bidder Shall Comply With the Requirements of the Build America, Buy America Act The Following Waivers Apply to This Contract: De Minimis, Minor Components, Pig Iron and Direct Reduced Iron Disadvantaged Business Enterprise Requirements Each Bidder Shall Take Special Notice of the Guidance for Use of Disadvantaged Business Enterprise in the Dwsrf Supplemental General Conditions. Failure to Complete These Requirements May Result in Finding That the Bidder is Nonresponsive and Therefore, Not Eligible to Be Awarded This Contract. Complete Requirements Are Located in the Bid Documents. Nondiscrimination in Employment and Labor Standards Bidders on This Work Will Be Required to Comply With the Presidents Executive Order No. 11246 and Amendments and Supplements to That Order. The Requirement for Bidders and Contractors Under This Order Are Located in the Dwsrf Supplemental General Conditions. Davis-bacon Requirements Davis Bacon Wage Rates Apply to This Project. Federal Requirements The Contractor Must Comply With the Department of Labor Regulations Relating to Copeland Anti-kickback Act (18 U.s.c. 874) as Supplemented by 29 Crf Part 3, Contract Work Hours and Safety Standards Act (40 U.s.c. 327- 330) as Supplemented by 29 Cfr Part 5, Occupational Safety and Health Standards (Osha) (29 Cfr Part 1910). The Contractor Must Comply With All Applicable Standards, Orders, or Requirements Issued Under Section 306 of the Clean Air Act (42 U.s. C. 1857(H)), Section 508 of the Clean Water Act (33 U.s.c. 1368), Safe Drinking Water Act, and Executive Order 11738, and the Environmental Protection Agency Regulations (40 Cfr Part 15). The Contractor Must Comply With All Permits, Restrictions and Conditions, Issued for the Project by Federal Cross-cutting Authorities. Disclaimer/agency Not a Party This Contract is Expected to Be Funded in Whole or in Part by the Maine Cd c Drinking Water Srf Program. This Contract Contains Requirements From This Funding Agency. Neither the Maine Cd c, Nor Any of Their Departments, Agencies, or Employees is or Will Be a Party to This Contract. The Word Agency in the Contract Documents Refers to These Funding Agencies. Award of Any Contract Will Be Contingent Upon Final Financial Agreements Between the Town and the Funding Agencies. The Project Scope May Be Adjusted to Match Available Funding. Doc note : Prospective Bidders May Obtain or Examine the Bidding Documents at the Issuing Office on Monday Through Friday Between the Hours of 9:00 Am and 4:00 Pm and May Obtain Copies of the Bidding Documents From the Issuing Office as Described Below. Partial Sets of Bidding Documents Will Not Be Available From the Issuing Office. Neither Owner Nor Engineer Will Be Responsible for Full or Partial Sets of Bidding Documents, Including Addenda, if Any, Obtained From Sources Other Than the Issuing Office. Format Cost Bidding Documents (Including Full-size Drawings) $150 Bidding Documents (Including Half-size Drawings) $100 Compact Disc Containing Bidding Documents in Portable Document Format (Pdf) $50 Electronic Transfer of Bidding Documents From [via Email, Drop Box, Etc.] $50

Award

Water / Sewer

$1,279,145.00

Public - State/Provincial

Site Work

9

14

28

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
22
Bidding Soon
358
All Active Projects
96
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 27, 2024

April 1, 2024

September 12, 2024

img_map_placeholder

Taylor St, Lincoln, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.