Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2024 at 8:00 PM

Updated March 14, 2024

Renovation of an educational facility in Superior, Wisconsin. Completed plans call for the renovation of a educational facility.

The work consists of: A horizontal lifeline will be fitted to an existing exterior platform. This will be steel framed construction and supported by existing steel shapes that make up the current tank stand and platform Existing platform is 13-0 tall. Connections will use both bolted and field/shop welded types including field welding shapes to the existing steel frame. All questions to be submitted by email to Ronald Daniel (Ronald.daniel@wisconsin.gove) and Kevin Romenesko (kromenesko@larsonengr.com) by 2 pm February 15, 2024

Bid Results

Educational

$43,000.00

Public - State/Provincial

Renovation

6

9

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
321
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 1, 2024

Project location map

2210 Poplar Ave, Superior, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed