Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 23, 2024 at 7:00 PM

Updated January 27, 2024

Site work, paving, outdoor lighting and new construction of a mixed-use development in Superior, Wisconsin. Completed plans call for site work for a water / sewer project; playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for the construction of a stadium.

In general, the work consists of excavation a portion of the former football field, surrounding recreational fields, and adjacent residence hall parking lots; replacement of the existing soils with filtration fabric, engineered fill, and drain tile to provide appropriate drainage capabilities and features; and installation of a new asphalt track with rubberized surface, new synthetic turf soccer field, water and sanitary utilities, storm water drainage and management infrastructure, field and site lighting, grandstand, press box, and protective fencing around the entire site. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontract with the successful MEP bidders.

Award

Arenas / Stadiums

$5,696,010.00

Public - State/Provincial

New Construction, Outdoor Lighting, Paving, Site Work

24

28

20

11

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
22
Bidding Soon
319
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

March 1, 2024

Project location map

1810 Catlin Ave, Superior, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed