BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Orland Park, Illinois. Completed plans call for site work for a water / sewer project.

**As of February 28, 2024, this project has not yet been awarded. The project is expected to be awarded on March 4, 2024 during the Board Meeting. Reference Number 0000339260 The Village of Orland Park ("Village") is requesting proposals for water main replacement in Phase II of the Catalina Subdivision. ("Project"). The contractor shall be responsible for all work required herein to be performed, and shall provide and furnish all labor, materials, equipment to complete the water main replacement according to Exhibit A and Exhibit B for drawings and specifications. This includes all water main structures, valves, and the repair of surface infrastructure once complete. Question Deadline 01/23/2024 at 12:00 PM CT Questions are submitted online Yes, All questions related to this proposal must be submitted online . Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 %. Each proposal must be accompanied by a proposal deposit, as earnest money, in the form of a bid bond, a certified check or cashier's check, drawn on a responsible bank, made payable to the Village of Orland Park for ten percent (10%) of the total amount of the proposal price. General Requirements - Insurance Required - Prevailing Wage Required Proposals will be opened and evaluated in private and proposal information will be kept confidential until an award is made. *The Village Reserves the Right to Reject Any and All Proposals and to Waive Any Irregularities.

Award

Water / Sewer

$6,247,978.00

Public - City

Site Work

48

7

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
88
Bidding Soon
1,727
All Active Projects
755
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

img_map_placeholder

Multiple Locations, Orland Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.