Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a museum in Oyster Bay, New York. Completed plans call for the renovation of a museum.
Construction of New Maintenance and Operations Facilities, Storage Shed, and Equipment Shed at Planting Fields Arboretum State Historic Park, 1395 Planting Fields Road, Nassau County, New York. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of: Plumbing Contract: $11,744.96 (Eleven Thousand Seven Hundred Forty-Four Dollars and Ninety-Six Cents) Location: Planting Fields Arboretum State Historic Park Provide and install all specified building and site plumbing and drainage systems for a "Maintenance and Operations" 8104sf building and a 2916sf "Equipment Shed". All Requests For Information (RFIs) are due by: 10:00 AM on Tuesday, January 30, 2024 RFIs received after this due date and time will not be processed. For all technical questions - Utilize the contacts noted below: (Please email everyone) Mr. Adam Katz 631-321-3519 Adam.Katz@parks.ny.gov, Mr. Scott Sepela 631-321-3536 Scott.Sepela@parks.ny.gov, LIEngineeringContracts 631-321-3544 LIEngineeringContracts@parks.ny.gov. For administrative related questions - Utilize the contact noted below: Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. PROJECT COMPLETION The completion date for this project is 547 days after agreement has been approved by the NYS Comptroller's Office. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 27% Women Owned Sub-Contracting Goal: 3% Service-Disabled Veteran-Owned Business Contracting Goal: 6% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Range: $209,647.00 - $283,640.00 The Bid opening will be conducted ONLY via WebEx at the link listed below: Join by meeting number Meeting number (access code): 2333 992 7340 Meeting password: BZk2hAP7sa5 Join by phone +1-518-549-0500 US (English Menu) +1-518-549-0059 US (Menú en Español) Global call-in numbers A. The scope of work consists of, but not limited to the following: 1. Provide variable refrigerant volume heart pump AC unit, fans, unit heaters, wall mount electric heaters, etc. as shown on the drawings and as specified hereinafter. 2. Provide diffusers, grilles and registers, louvers as shown on drawings and as specified hereinafter. 3. Provide all low leakage control dampers as noted on plans and as specified hereinafter. 4. Provide all new ducting and duct accessories, all new access doors, all new control wiring and conduits, all insulation, all new hangers and supports and all other accessories required for the proper installation and performance of the new equipment. 5. Provide controls for AC units, fans, unit heaters, electric duct heaters and all related equipment as shown on drawings and hereinafter. Provide all required sensors and controllers as shown on drawings as specified and required for a fully functional system. 6. In addition to labor and material guarantee specified herein, the contractor shall provide one-year of service & maintenance starting from the date of completion and testing of the new air conditioning system, heating system units and fans. The schedule of service and maintenance shall be as per unit of manufacturers recommendations. 7. Testing, balancing, and adjusting of the new heating & cooling system and air balancing as specified hereinafter. 8. The general contractor (GC) is responsible for all cores and other openings in exterior walls, interior partitions, slabs, roofing, etc., for ducts, piping, sleeves, conduits, and other penetrations. The Mechanical contractor shall coordinate the locations of all openings with general contractor. 9. The Mechanical contractors shall provide all sleeves, conduit, escutcheons, etc. in the wall/floor/roof penetrations. The general contractor shall provide the fire stopping and/or insulation at all penetrations around the ducts, and conduit, etc. 10. Provide all hoisting and rigging of equipment and material required to complete work of this section. 11. Provide all vibration isolation. 12. Provide all finish work at all penetrations and equipment to include penetrations, penetration sleeves, firestopping, escutcheons, etc. The contractor is responsible for all caulking, sealants, gaskets, etc. related to their work. 13. The contractor is responsible to coordinate work to include equipment pads, louvers, finish patching and painting to be provided under general construction. 14. The contractor is responsible to coordinate work to include equipment raceways and backboxes for automatic temperature control, all starter and disconnects size and locations for equipment provided under this contract. 15. The mechanical contractor is responsible for protecting all construction adjacent to their work. Any damage must be repaired with no additional cost to Owner. SCOPE OF WORK A. General: 1. Testing, adjust and confirm design airflows rates, pressure drops, operating pressures, temperatures and heat transfer performance for HVAC systems, to include air systems, associated fans, diffusers, and accessories, etc. 2. Provide all necessary labor, materials, products, equipment and services to balance and test all HVAC systems, to verify conformance to specified quantities, and to the design of the mechanical system and for the testing of all the fire safety ventilations systems. 3. Cooperate with all other trades, including, but not limited to, (BMS) building controls, fire alarm, sheet metal and piping sub-Contractors to ensure the Work is carried out without interference to other Work. 4. Provide openings required for pitot tube traverses. After balancing, close sheet metal openings with removable gasketed plugs. Submit samples of proposed plugs to the Engineer for approval. 5. Conduct regular inspections during the mechanical systems installation and report on ductwork installation (likely to produce abnormal leakage or restrictions to airflow), piping installation, proper placement of dampers or valves, and any circumstance which will encumber the testing and balancing of the mechanical systems. 6. Include all items of labor, materials, products, equipment and devices required to comply with standards and codes of the Authorities having Jurisdiction in accordance with the contract documents to balance all air and hydronic systems, to verify conformance to specified quantities and to the design of the mechanical system. Where quantities, sizes or other requirements indicated on the drawings or herein specified are in excess of the standard or local code requirements, the specifications and drawings shall govern. B. All work related to the preparation of the systems shall be the responsibility of the Contractor. No work shall proceed on the Testing, Balancing and Adjusting until all items required to be completed prior to the start of TAB work outlined in this section are complete.
Bid Results
Museum
$392,500.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2024
March 28, 2024
1395 Planting Fields Rd, Oyster Bay, NY
Related To This Project
Oyster Bay, NY
Bid Date: Mar 06 2024
Oyster Bay, NY
Bid Date: Feb 14 2024
Oyster Bay, NY
Bid Date: Feb 14 2024
Oyster Bay, NY
Bid Date: Mar 19 2024
Oyster Bay, NY
Bid Date: Mar 19 2024
Oyster Bay, NY
Bid Date: May 12 2021
Oyster Bay, NY
Bid Date: Mar 27 2024
Oyster Bay, NY
Bid Date: Feb 27 2024
Oyster Bay, NY
Bid Date: Feb 27 2024
Oyster Bay, NY
Bid Date: Jan 10 2024
Oyster Bay, NY
Bid Date: Dec 20 2023
Oyster Bay, NY
Bid Date: Nov 29 2023
Oyster Bay, NY
Bid Date: Dec 06 2023
Oyster Bay, NY
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.