BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Oyster Bay, New York. Completed plans call for the renovation of a museum.

Construction of New Maintenance and Operations Facilities, Storage Shed, and Equipment Shed at Planting Fields Arboretum State Historic Park, 1395 Planting Fields Road, Nassau County, New York. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a scanned Bid Security in the form of a certified check, bank check, or bid bond in the amount of: Plumbing Contract: $11,744.96 (Eleven Thousand Seven Hundred Forty-Four Dollars and Ninety-Six Cents) Location: Planting Fields Arboretum State Historic Park Provide and install all specified building and site plumbing and drainage systems for a "Maintenance and Operations" 8104sf building and a 2916sf "Equipment Shed". All Requests For Information (RFIs) are due by: 10:00 AM on Tuesday, January 30, 2024 RFIs received after this due date and time will not be processed. For all technical questions - Utilize the contacts noted below: (Please email everyone) Mr. Adam Katz 631-321-3519 Adam.Katz@parks.ny.gov, Mr. Scott Sepela 631-321-3536 Scott.Sepela@parks.ny.gov, LIEngineeringContracts 631-321-3544 LIEngineeringContracts@parks.ny.gov. For administrative related questions - Utilize the contact noted below: Ms. Margaret Ziminski/ Ms. Tiffany Willms 631-321-3544 LIEngineeringContracts@parks.ny.gov The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. PROJECT COMPLETION The completion date for this project is 547 days after agreement has been approved by the NYS Comptroller's Office. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 27% Women Owned Sub-Contracting Goal: 3% Service-Disabled Veteran-Owned Business Contracting Goal: 6% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Range: $209,647.00 - $283,640.00 The Bid opening will be conducted ONLY via WebEx at the link listed below: Join by meeting number Meeting number (access code): 2333 992 7340 Meeting password: BZk2hAP7sa5 Join by phone +1-518-549-0500 US (English Menu) +1-518-549-0059 US (Menú en Español) Global call-in numbers A. The scope of work consists of, but not limited to the following: 1. Provide variable refrigerant volume heart pump AC unit, fans, unit heaters, wall mount electric heaters, etc. as shown on the drawings and as specified hereinafter. 2. Provide diffusers, grilles and registers, louvers as shown on drawings and as specified hereinafter. 3. Provide all low leakage control dampers as noted on plans and as specified hereinafter. 4. Provide all new ducting and duct accessories, all new access doors, all new control wiring and conduits, all insulation, all new hangers and supports and all other accessories required for the proper installation and performance of the new equipment. 5. Provide controls for AC units, fans, unit heaters, electric duct heaters and all related equipment as shown on drawings and hereinafter. Provide all required sensors and controllers as shown on drawings as specified and required for a fully functional system. 6. In addition to labor and material guarantee specified herein, the contractor shall provide one-year of service & maintenance starting from the date of completion and testing of the new air conditioning system, heating system units and fans. The schedule of service and maintenance shall be as per unit of manufacturers recommendations. 7. Testing, balancing, and adjusting of the new heating & cooling system and air balancing as specified hereinafter. 8. The general contractor (GC) is responsible for all cores and other openings in exterior walls, interior partitions, slabs, roofing, etc., for ducts, piping, sleeves, conduits, and other penetrations. The Mechanical contractor shall coordinate the locations of all openings with general contractor. 9. The Mechanical contractors shall provide all sleeves, conduit, escutcheons, etc. in the wall/floor/roof penetrations. The general contractor shall provide the fire stopping and/or insulation at all penetrations around the ducts, and conduit, etc. 10. Provide all hoisting and rigging of equipment and material required to complete work of this section. 11. Provide all vibration isolation. 12. Provide all finish work at all penetrations and equipment to include penetrations, penetration sleeves, firestopping, escutcheons, etc. The contractor is responsible for all caulking, sealants, gaskets, etc. related to their work. 13. The contractor is responsible to coordinate work to include equipment pads, louvers, finish patching and painting to be provided under general construction. 14. The contractor is responsible to coordinate work to include equipment raceways and backboxes for automatic temperature control, all starter and disconnects size and locations for equipment provided under this contract. 15. The mechanical contractor is responsible for protecting all construction adjacent to their work. Any damage must be repaired with no additional cost to Owner. SCOPE OF WORK A. General: 1. Testing, adjust and confirm design airflows rates, pressure drops, operating pressures, temperatures and heat transfer performance for HVAC systems, to include air systems, associated fans, diffusers, and accessories, etc. 2. Provide all necessary labor, materials, products, equipment and services to balance and test all HVAC systems, to verify conformance to specified quantities, and to the design of the mechanical system and for the testing of all the fire safety ventilations systems. 3. Cooperate with all other trades, including, but not limited to, (BMS) building controls, fire alarm, sheet metal and piping sub-Contractors to ensure the Work is carried out without interference to other Work. 4. Provide openings required for pitot tube traverses. After balancing, close sheet metal openings with removable gasketed plugs. Submit samples of proposed plugs to the Engineer for approval. 5. Conduct regular inspections during the mechanical systems installation and report on ductwork installation (likely to produce abnormal leakage or restrictions to airflow), piping installation, proper placement of dampers or valves, and any circumstance which will encumber the testing and balancing of the mechanical systems. 6. Include all items of labor, materials, products, equipment and devices required to comply with standards and codes of the Authorities having Jurisdiction in accordance with the contract documents to balance all air and hydronic systems, to verify conformance to specified quantities and to the design of the mechanical system. Where quantities, sizes or other requirements indicated on the drawings or herein specified are in excess of the standard or local code requirements, the specifications and drawings shall govern. B. All work related to the preparation of the systems shall be the responsibility of the Contractor. No work shall proceed on the Testing, Balancing and Adjusting until all items required to be completed prior to the start of TAB work outlined in this section are complete.

Bid Results

Museum

$392,500.00

Public - State/Provincial

Renovation

108

36

130

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
231
Bidding Soon
4,280
All Active Projects
1,990
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

March 28, 2024

img_map_placeholder

1395 Planting Fields Rd, Oyster Bay, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.