BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Toledo, Ohio. Completed plans call for site work for a water / sewer project.

2024 Concrete Restoration from Lead Service Line Replacement The City of Toledo, Division of Water Distribution is requesting quotes for the replacement of concrete following utility cut services located within the limits of the City of Toledo. Bid Guaranty requirements are located on the "Bid Information" tab on online The bid guaranty shall be in the form of a cashier's check/official check on a solvent bank or a bid bond. If using a check as the bid guaranty, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. The check must also be scanned and uploaded with the e-bid. Company checks and personal checks will NOT be accepted. Checks shall be made payable to "City of Toledo." The following items will be required upon awarding the contract: Performance Bond and PLA, if applicable. Special Notices Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations. Current prevailing wage rates may be found on the Division of Purchases and Supplies Other required forms include those noted in the Response Type Section and also noted in the Other Details Section: Signed Contract by Vendor CEO/President; Child Support Affidavit; Insurance Certificate listing the city of Toledo as an additional insurer; and Current Worker's Compensation Certificate. As noted above, City forms must be filled out and attached to the bid. Project Paperwork includes the following: Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria. License Requirements City of Toledo Contractor's License Preferences MBE - Minority-Owned Business Enterprise WBE - Woman-Owned Business Enterprise Project Duration 365 days Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Q&A Deadline 01/25/2024 4:00 PM (EST) All questions regarding the plans and specifications must be in writing submitted through the Online website Q&A tab

Bid Results

Water / Sewer

$109,230.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
177
Bidding Soon
2,559
All Active Projects
976
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 30, 2024

February 29, 2024

March 30, 2025

img_map_placeholder

Multiple Locations, Toledo, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.