BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a mixed-use development in Cottleville, Missouri. Completed plans call for the renovation of a educational facility.

No official pre-bid meeting will be held for this project. Requests for Substitutions of Materials Must Be Made in Writing NO LATER THAN 5:00 P.M. CDT ON THURSDAY, JANUARY 18, 2024. Requests Submitted After That Date Will Not Be Considered.All Bidders Will Be Informed in Writing by the Architect of All Interpretations or Acceptable Material Substitutions Made During the Time of Bidding; in the Absence of Such Approval All Items Shall Be Furnished as Specified. Project Schedule: A. Henderson Elementary School (Base Bid AND Bid Alternative #1): (1) Begin Construction June 3, 2024 (2) Substantial Completion August 2, 2024 B. Fairmount Elementary School: (1) Begin Construction June 3, 2024 (2) Substantial Completion August 2, 2024 C. Central School Road Early Childhood Center: (1) Begin Construction June 3, 2024 (2) Substantial Completion July 5, 2024 D. Hackmann Road Early Childhood Center: (1) Begin Construction June 3, 2024 (2) Substantial Completion July 5, 2024 E. Meadows Parkway Early Childhood Center: (1) Begin Construction June 3, 2024 (2) Substantial Completion July 5, 2024 Each General Contractor shall file with his bid a cashiers check in the amount of five percent (5%) of the total bid. A. In lieu of a cashiers check, a surety company bid bond in the minimum amount of five percent (5%) of the total bid will be acceptable. The bond MUST be on AIA Form A310 to be accepted. The bid bond amount shall cover the TOTAL CONTRACT amount including performance and payment bond costs. B. The check or bond shall be submitted as evidence of good faith on the part of the Contractor that he will proceed into execution of a formal contract for the erection, construction, and completion of the work or such portion of the work as may be determined by the Owner. Check shall be made payable to the Owner. C. Bid bond or cashier's check of the unsuccessful bidders will be returned after award of contract has been made, and that of the successful bidder will be returned after execution of the Contract. Proposals must be filed on copy or facsimile of Form of Bid furnished by the Architect All bids, mailed or otherwise delivered, shall be filed at or before the date and time designated in the Advertisement for Bids. The Owner will open the bids in public session Not less than the prevailing hourly wage rates, as determined by the State of Missouri, Division of Labor Standards, shall be paid all workers employed on this project. The Board of Education reserves the right to waive technicalities, to select any contractor filing a proposal, and to reject any or all bids.

Award

Educational

$1,663,846.00

Public - City

Renovation

72

29

11

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
60
Bidding Soon
830
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

June 3, 2024

img_map_placeholder

Multiple Locations, Cottleville, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.