BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Platteville, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes, but not limited to, the following Work: In the existing Filter Building at the wastewater treatment facility site: demolition and replacement of various process valves, associated actuators, piping appurtenances, pipe supports, pneumatic systems, painting and coating, and electrical work and allied systems, such as control stations, SCADA system improvements, and process instrumentation and control. The anticipated substantial completion date is December 31, 2024 and final completion date is March 31, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Owner reserves the right to waive any informalities or to reject any or all bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Matt Castillo, P.E., 1702 Pankratz Street, Madison, WI 53704. 608-242-7779. mcastillo@msaps.com. DESCRIPTION OF WORK The work under this section shall cover: starting of systems; demonstration and instructions; testing, adjusting and balancing; operation and maintenance data; protecting installed and completed construction; final cleaning; manuals for materials and finishes; manual for equipment and systems; spare parts and maintenance products; product warranties, guarantees and bonds; project closeout procedures; and maintenance service. The Contractor shall assume the responsibility for the protection of all finished construction until accepted by the Owner. The Contractor shall repair and restore any and all damage to finished work to the satisfaction of the Engineer. The Contractor shall require each trade to clean the premises of accumulations of surplus materials and rubbish caused by their activities. Burning of rubbish on site will not be permitted.

Award

Water / Sewer

$758,457.00

Public - City

Renovation, Site Work

31

20

4

10

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
24
Bidding Soon
585
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

March 8, 2024

img_map_placeholder

1700 Greenwood Ave, Platteville, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.