BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2024 at 8:00 PM

Updated March 21, 2024

Site work for a road / highway in Platteville, Wisconsin. Completed plans call for site work for a road / highway.

This project consists of painting centerline stripes, stop bars, crosswalks, words and symbols on selected streets in the City of Platteville. This is a re-paint of existing lines. Sealed bids must be accompanied by a certified check or bid bond payable to the City of Platteville, Wisconsin in the amount of not less than five (5) percent of the total amount of bid as a guarantee that if the bid is accepted, bidder will execute and file proper contract documents, performance bond and insurance within ten (10) days after award of the contract. When the intended awardee so executes the contract agreement and files bonds and insurance as required by the contract documents, the check or bid bond will be returned. In case the intended awardee fails to execute the contract agreement and file bonds and insurance as required by the contract documents, the amount of the check or bid bond submitted with the contractor's proposal shall be forfeited as liquidated damages. All bids shall be made out on the proposal forms furnished by the City of Platteville in the contract documents. Any alteration or extension of the form or the furnishing on it of unsolicited information may cause the bid to be declared informal and result in its being rejected. No bid shall be withdrawn for a period of thirty (30) days after the scheduled time of opening bids. The City of Platteville reserves the right to reject any or all bids, to waive any informalities in bidding, or accept the bid deemed most advantageous to the City. Time of completion for this project is August 15, 2024. Completion means that all work, including clean up, has been accomplished. Base Bid and Alternate C are near the University of Wisconsin - Platteville. It is required to start after May 20, 2024 to avoid campus traffic. Alternate B is near Southwest Health Center. The contractor can expect emergency vehicles using the road and must be prepared to accommodate such traffic. All work must be completed within 5 working days of starting work, unless there are weather delays. This may be scheduled at the Contractor's Discretion beginning at the Notice to Proceed date. The Contractor is required to notify the City of Platteville Street Department (608) 348-8828 at least 2 business days prior to starting work.

Award

Roads / Highways

$15,006.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
62
Bidding Soon
1,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

May 20, 2024

Project location map

Multiple Locations, Platteville, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.