BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Denver, Colorado. Completed plans call for site work for a water / sewer project.

The Monarch Middle Fork Project is located in the Middle Fork of the South Arkansas River drainage basin, to the north of the town of Garfield, Colorado. Please see the attached maps. The project work will include safeguarding 23 hazardous mine openings. There are 6 vertical openings and 17 adits. Closure methods include polyurethane foam plugs covered with backfill (PUF), steel grate, native rock bulkhead, cable net, and backfill. Detailed work descriptions are provided below in the Work List and a copy of the Standard Work Specifications (SWS) as specified in the Colorado Inactive Mine Reclamation Program General Bid Specifications, 2009 in addition to all applicable regulations are provided on the google drive link found below. The use of a helicopter to supply equipment and materials is recommended. No Bid Bond is required for Documented Quotes The project is scheduled for construction between Monday, July 8 2024 and Thursday, September 5 2024. This includes ten (10) days mobilization time. These dates are tentative and may change Service-Disabled Veteran Owned Small Businesses may receive a 5% preference on their bid Pre-bid meeting info : Any CONTRACTOR interested in submitting a bid for the above referenced project must attend the entire virtual pre-bid meeting by telephone/video. Registered CONTRACTORS are strongly advised to review provided information regarding the project prior to the virtual pre-bid meeting to ensure that any necessary questions and clarifications can be addressed by the PROJECT MANAGER. The virtual pre-bid held by telephone/video conference is for the purpose of explaining the work, location and access. No onsite showing of the proposed project will be provided. The PROJECT MANAGER will record the firms in attendance by requesting the company/individual name, mailing address, phone number and email. Failure to register for and attend the entire virtual pre-bid meeting will be cause for rejection of a bid.

Post-Bid

Water / Sewer

$240,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
1,004
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

July 8, 2024

img_map_placeholder

Multiple Locations, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.