BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Spartanburg, South Carolina. Completed plans call for site work for a water / sewer project.

**As of March 7, 2024, the project was awarded to Tom Brigman Contractors, with an awarded amount of $3,278,375.87.** Questions should be directed to the attention of: Kevin Smith Spartanburg Water 175 N. Liberty Street, Spartanburg, South Carolina Phone: 864-580-5649 Email: ksmith@spartanburgwater.org To receive a response, which will be distributed to all plan-holders of record, questions must be received prior to 5:00 p.m. on Tuesday, February 5, 2024. A satisfactory Bid Bond provided by an acceptable surety (or the cash equivalent) in an amount equal to five percent (5%) of the total bid shall be submitted with each bid. The Owner reserves the right to accept or reject any bids that appear to be in the best interest of the Owner, and further reserves the right to waive irregularities in the bids and to reject any and all bids received. Performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price will be required. The bonds must be secured by cash or must be issued by a surety company licensed in the State of South Carolina with an "A" minimum rating of performance as stated in the most current publication of "Best Key Rating Guide, Property Liability." Certificates of insurance naming the Owner as an additional insured and with limits as noted in the bid documents will be required. Contractors submitting bids shall be properly licensed in the State of South Carolina to bid and perform the work on which the bid is submitted at the date of the bid. It is the policy of Spartanburg Water that local minority and women owned enterprises (MWBE) shall be afforded the opportunity to participate fully in the overall procurement of Spartanburg Water. This is an equal opportunity selection. The project consists of the installation of approximately 1,370 linear feet of 18" gravity sewer and 7,315 linear feet of 15" & 16" gravity sewer.

Award

Water / Sewer

$3,278,375.00

Public - City

Site Work

24

12

2

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
1,121
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Spartanburg, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.