Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 28, 2024 at 7:00 PM

Updated February 29, 2024

Site work and paving for a road / highway in Morada, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work is located in northeast Stockton. The work, in general, consists of repairing and resurfacing approximately 1.0 mile of roadway with asphalt concrete. Base Estimate Range between $553,000 and $676,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids are required for the entire work described herein. A bid security of 10% is required from all bidders. The bid security must be in the form of cash, certified or cashier's check, electronic bond (eBond), or a bid bond in favor of the Department. Bid Security other than electronic bond must be received by the Department prior to the bid opening closing time specified above. A payment bond and a performance bond each 100% of the value of the contract are required from the successful bidder. Question Deadline 01/29/2024 Questions submitted less than 72 hours in advance of bid opening may not receive a response.Submit all bidder inquires directly through the Department's solicitation page under the section titled "Q&A." The Contractor must possess a Class A or Class C-12 license at the time this contract is awarded. When a Federal wage rate determination has been included and a difference from the State Department of Industrial Relations determination exists, the higher rate must be paid. The Board reserves the right to reject any or all bids and further reserves the right to waive minor irregularities in the bids. PROJECT: MORADA AREA STREETS RESURFACING 2024 (Broughton Drive: Springfield Way to Madeline Drive; Camden Court: West End to Springfield Way; Hickory Avenue: Morada Lane to N/E End; West End to Plum Avenue; Madeline Drive: Morada Lane to Broughton Drive; Morada Lane: East Alhambra Avenue to Michelle Lane; Springfield Way: Broughton Drive to Ashley Lane)

Bid Results

Roads / Highways

$573,915.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
197
Bidding Soon
3,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 15, 2024

Project location map

Multiple Locations, Morada, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed