Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 10, 2025
Site work for a mixed-use development in Needham, Massachusetts. Conceptual plans call for site work for a educational facility.
UPDATE :Eliot Fields Renovation - ($1,500,000) This request is for the construction phase of the project. Funding for the design will be requested for FY2026. Eliot School fields are showing signs of age due to poorly draining subsurface materials which impact the health of the turf and make the fields more expensive to maintain. It is on a physically limited site which causes the turf to wear and makes it more difficult to maintain a surface that is appropriate for kids to use. The design would include a transition to a synthetic field. It has been a struggle to maintain a consistent ground cover with the natural turf grass. Due to the smaller size of the Eliot field and the high amount of regular student traffic, switching to synthetic material would be a more economical and durable option that will greatly assist in maintaining a consistent field covering. The playground at Eliot is past its useful life and presents maintenance challenges due to the wood fiber migration. There is also a lack of accessible and sensory playground equipment. To benefit from an economy of scale, the field, courts, and playground at Eliot would be designed and constructed simultaneously under this request. The playground would be redesigned with a poured-in-place protection surface that presents fewer maintenance challenges and can be properly contained in the play area, and accessible and interactive sensory playground pieces would be incorporated. Project is in Town of Needham capital budget fy 2026-2030 CIP ___________________________________________________________________________ Athletic Facility Improvements (Eliot Field Construction) - Fiscal year 2025-2029 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$1,500,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2028
135 Wellesley Ave, Needham, MA
Related To This Project
Needham, MA
--
Needham, MA
Bid Date: Jun 05 2025
Needham, MA
Bid Date: Feb 15 2024
Needham, MA
Bid Date: Jan 11 2019
Needham, MA
--
Needham, MA
Bid Date: Apr 23 2021
Needham, MA
Bid Date: Jan 04 2024
Needham, MA
Bid Date: Dec 13 2023
Needham, MA
Bid Date: Dec 13 2023
Needham, MA
Bid Date: Dec 11 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
