BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mount Holly, New Jersey. Completed plans call for site work for a water / sewer project.

The County of Burlington seeks bids for the provision of goods/services as per the specifications issued for the solicitation of bids titled. The County is not responsible for any bid not submitted on time. The County is not responsible for any internet or electronic issues that may include, but not be limited to, connection issues, technical difficulties, errors, power outages, etc. The Division of Purchasing's public office hours are Monday through Friday from 9:00 AM to 4:00 PM (local time), County holidays excluded. All solicitations are subject to change. It is the responsibility of the vendor to check the website for any future addenda, revisions, etc. prior to the opening date. Failure to do so could result in rejection of your bid submission. DEADLINE FOR QUESTIONS: JANUARY 22, 2023 AT 5:00 P.M. (local time). Please visit the solicitation at https://burlcobids.ionwave.net to submit questions by the deadline. Cured-In-Place Pipe Liner (CIPPL) - This work shall consist of installing a Cured-in-Place Pipe Liner (CIPPL) that is inverted into and through existing various pipe sizes (12" to 36"). This work shall include but not limited to reinforced concrete, corrugated metal, and vitrified clay pipes to rehabilitate any structurally and/or functionally deteriorated storm sewer pipes using the trenchless method. The CIPPL shall be inserted through existing structures including but not limited to Type B-inlets, manholes, and bridge abutment walls utilizing a vertical inversion standpipe and hydrostatic pressure. The CIPPL resin shall then be cured in by an approved EPA/DEP material into a hard, impermeable pipe. When cured, the CIPPL shall extend over the entire length of the inversion and shall form a continuous watertight-pipe-within-a-pipe. Any excess water or material must be removed from the stormwater system by the Successful Bidder. No contaminants shall discharge out the stormwater system. This work shall include design, construction, installation, operation, maintenance, and removal of Temporary Drainage Pipe By-pass System. The by-pass system shall be of adequate capacity to handle the flow. The system shall be designed and maintained in accordance with NJDEP regulations for waterways.

Bid Results

Water / Sewer

$12,892,500.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
253
Bidding Soon
3,740
All Active Projects
1,686
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Mount Holly, NJ

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.