BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Bath, Ontario. Completed plans call for the renovation of a detention facility.

Reference Number cb-263-34335918 The Correctional Service Canada has a requirement for the removal and replacement of thirteen (13) tub/shower units and thirteen (13) shower units in the housing complexes at Bath Institution. Objectives: To renovate all of the current tub/shower rooms and stand-alone shower rooms in the housing complexes at Bath Institution with once piece, fiberglass units, new hardware, and new flooring. Deliverables: 1 the Contractor Must Remove Thirteen (13) Tub/shower Units and Thirteen (13) Showers, Including All Surroundings and Flooring, and Dispose of Them Off-site as Per All Current Environmental Regulations. 2 the Contractor Must Replace or Repair All Damaged Drywall and Sub-floors Prior to Installation of the New Tub/shower Units, Shower Units and Flooring. 3 the Contractor Must Install All Appropriate Backing to Minimize Flexing in the New Units. 4 the Contractor Must Install Appropriate Bracing Behind the New Shower Valves and Shower Heads to Minimize Damage Caused by High Use. 5 the Contractor Must Install Thirteen (13) New, One-piece Fiberglass Tub/shower Units Measuring Approximately Sixty (60) Inches Long by Thirty (30) Inches Wide by Eighty (80) Inches High, Ensuring All New Valve and Drain Holes Correspond to Existing Plumbing. 6 the Contractor Must Install Thirteen (13) New, One-piece Fiberglass Shower Units Measuring Approximately Thirty-six (36) Inches Long by Thirty (30) Inches Wide by Eighty (80) Inches High, Ensuring All New Valve and Drain Holes Correspond to Existing Plumbing. 7 the Contractor Must Install New Grey, Waterproof, Rolled Vinyl Flooring, With a Minimum Thickness of 6mm, in All Twenty-six (26) Tub/shower and/or Shower Rooms. Flooring Must Be Secured to the Wall in Order to Have a Four (4) Inch Run Up the Wall From the Floor, to Ensure a Seamless Joint at the Floor/wall Joint, Caulking the Seam Between the Flooring and Shower or Shower/tub Unit. 8the Contractor Must Install a New Fixed Time and Temperature Push Button Shower Valve (With Replaceable Cartridges), and a Wall Mounted Zurn Model #z7000-12 (or Equivalent) Shower Head, in Each of the Thirteen (13) New Shower Units. 9the Contractor Must Install a 3-piece Commercial Grade Tub and Shower Package, That Includes a Moen Model #t8370cbn (or Equivalent) Single Handle Control Valve and Trim, a Zurn Model #z7000-12 (or Equivalent) Shower Head and Standard Tub Spout in Each of the Thirteen (13) New Tub/shower Units. 10 the Contractor Must Use Bathroom Appropriate Caulking to Ensure All the Units Are Waterproof and Will Prevent Water Damage. 11 the Contractor Must Paint All Thirteen (13) Tub/shower Rooms and Thirteen (13) Shower Rooms With Mildew Resistant Paint (Colour to Be Decided by the Project Authority). Construction Time: The Contractor Must Perform and Complete the Work Within Eight (8) Weeks From the Date of Notification of Acceptance of the Offer. Documents can be obtained at https://canadabuys.canada.ca/

Award

Jails / Prisons

$362,617.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
560
All Active Projects
233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 13, 2024

img_map_placeholder

5775 Bath Rd, Bath, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.