BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a communication facility in Flagstaff, Arizona. Working plans call for site work for a communication facility.

SCOPE OF WORK A. Connect City Facilities and Smart City Infrastructure The selected Contractor will design, construct, and install City conduit and fiber to all City facilities and Smart City infrastructure identified on the attached maps in order to help build out the City Network. Please refer to attached maps. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Project Type RFQual (Request for Qualification) Response Types Response File Type of Award Lump Sum The City is not requiring the selected Contractor to construct the exact routes identified by the City (see blue "Planning FiberLines" in attached maps), however deviating too far from the desired paths may result in a lower scoring or complete disqualification. Final routes will be mutually agreed upon. The Contractor will be expected to enter into the City's standard form of Design Build construction contract (attached), although some terms may be negotiable. Upon final acceptance, City will own all conduit and fiber necessary to operate the "City Network" (per definition in the Project Overview). The selected Contractor will install the City conduit and fiber compatible with most common standard and connectors, specifications are flexible. 1. City Conduit Specifications Conduit installed for City will be minimum 3" in diameter. An ADOT #9 pull box is required at every intersection or street crossing. Please refer to Flagstaff City Code - 13-16-007-0002, Fiber-Optic Conduit for more information. 2. City Fiber Specifications The City fiber will consist of minimum 144 strand bundles and generally fit within MaxCell innerducts. B. Connect Community Government and Educational Facilities City will work with the selected Contractor to facilitate connections with Community Government and Educational Facilities. Any contract for installation of City conduit and fiber will be coordinated with these community partners to the extent feasible. C. Bring Better and Faster Internet Access to the Community 1. Fiber Service Buildout The selected Contractor will commit to building out a fiber/conduit network within the Flagstaff City limits and per the schedule as negotiated by the parties. The selected Contractor will provide a map of the areas served and the schedule for buildout. The Contractor is assumed to own all infrastructure associated with this "Community Network" (per definition in the Project Overview). 2. Internet Service In an "open access" model the applicant could partner with a separate Internet Service Provider to provide the actual home and business services. In this scenario, the fiber infrastructure would need to be available for the opportunity to be built to every household and business in the Flagstaff region. If the selected Contractor does not commit to offering internet services, it shall commit to offering its network to internet service providers for competitive use (not exclusive use to a single company). If the selected Contractor commits to offering internet service, it will offer minimum 1Gb speed to all Flagstaff residents and businesses located within Flagstaff City limits to be included as part of the negotiated contract. 3. Licensing and Fees for Use of Public Right-of-Way The selected Contractor will be required to enter into a License Agreement for use of the public right-of-way. The City may require payment of an annual license fee applicable to all other similarly situated fiber network providers for use of the public right-of-way. The City has not yet adopted such a fee. The City is willing to include a provision in its agreement with the selected Contractor allowing for waiving payment of license fees in consideration for in kind services of substantially equal value to support our objective of City-owned conduit and fiber. The City is reviewing other Arizona cities' fee structures at this time. The selected Contractor will be responsible for paying standard permitting fees for work in the public rights-of-way are found in Flagstaff City Code, Title 13, Chapter 13-10 User Fees, Section 3-10-01-002. The City does not offer expedited review but is willing to work with the selected Contractor to streamline permitting to the extent feasible. The City will provide opportunities for use of City property and right-of-way for fiber distribution boxes, Last Day for Questions: Monday, March 4th, 2024 by 3:00pm

Final Planning

Communication

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
115
All Active Projects
51
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 19, 2024

November 19, 2024

img_map_placeholder

Multiple Locations, Flagstaff, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.