Renovation of a municipal facility in Milford, Michigan. Completed plans call for the renovation of a municipal facility.
Reference Number 0000347977 The Road Commission for Oakland County is requesting proposals for Wastewater Tank Replacement - Milford Garage, to include all labor, equipment and materials needed to complete the replacement as specified. Lump-sum proposal pricing. Wastewater Tank Replacement - Milford Garage located at 4353 Duck Lake Road, Milford, Michigan 48381. Question Deadline 04/17/2024 at 12:00 AM ET Questions are submitted online No. Any response will be in the form of an on-line addendum which shall be acknowledged by prospective bidders. Purchasing Agent: Tracy McDonald 248-858-4796 purchasing@rcoc.org . General Requirements - FOB Destination Award Requirements - All or None Award * RCOC reserves the right to reject any and all proposals or any part thereof. Any incomplete proposal and any proposal in which prices are obvious errors may be rejected. A non-conforming response to the specifications or terms and conditions will be considered non-responsive and may be rejected. Scope of work for Wastewater Tank Replacement - Milford Garage: A) EXCAVATION: Remove tank from pavement and soil covered area. Topsoil can be reused after installation and dressed and seeded. Reinstall tank in area off driveway with accessible risers and ports. Excavate inside of building to replace damaged piping to tank. Shoring should be supplied due to the depth of the excavation. Fencing around excavation should be supplied. RCOC will need to be present for all line and tank disconnections. All dirt and pea stone shall be removed offsite and will be the responsibility of the contractor. Cement tank pads are not known to exist, but if found, they must be removed before installation of the new tank. B) TANKS: Furnish and install one 20,000 gallon double walled, fiberglass USTs, 10 foot in height. Tank will be backfilled with pea gravel. The primary material being used for backfilling must not be frozen or contain any frozen particles. It must not contain any sort of rubbish, sand, rocks, organic substances, roots, dirt, ice, or snow. The substance being used must be washed naturally and rounded 1/8" to 3/4" with no more than 3% passing a 3/8" sieve, and in a state to flow free. The installer or designer must install geotextile filter fabric on the bottom and sides of the tank hole. Filter fabric must be positioned before the pea stone bedding is in place. A 12 to 18 inch base of pea gravel must be set under each tank. Proper backfilling will require multiple lifts of 12 inches each. Pea gravel will be installed to cover tank and up to the 36" subgrade. Filter fabric will be placed on top of the stone before any soil backfill. Furnish and install anchoring system including pre-cast concrete deadman anchors and fiberglass straps. C) MANHOLES/SPILL CONTAINERS/OVERFILL: Provide clock gauge and hardware installed in an access port. Provide risers and manway access to tank. Provide pump out access and tubing for vacuum truck through an access port. Provide a battery-operated high-water alarm to operate at 80% capacity. D) PIPING: Remove and replace existing piping back to oil/water separator with 8-inch PVC to include cleanout outside of building. The pipe trench will be backfilled with Class II sand. E) PERMITS: Provide any necessary permits for closure, removal, and installation of UST. F) ELECTRICAL: Tank is gravity feed and no hardwired electrical is required. G) PAVEMENT REPLACEMENT Replace removed pavement in the driveway and parking area with 12-inch compacted base of 21AA, 3 inches of 3E3 base coat 2 inches of 5E3 wear coat Each layer must be compacted to 96% density. H) DEWATERING, WATER DISPOSAL AND ADDITIONAL STONE Dewatering may be needed during the project with manifests and documentation of proper disposal. This cost will be the responsibility of the contractor. Disposal of wastewater in tanks will be coordinated prior to construction by RCOC and waste hauler. Minimal water removal may be needed before UST removal. This will be the responsibility of the contractor. Water to ballast the tanks during installation can be supplied by RCOC wells. The contractor is responsible for disposal of the water, after construction. No city sewer is available at this location.
Bid Results
Municipal
$248,558.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2024
May 23, 2024
4353 S Duck Lake Rd, Milford, MI
Related To This Project
Milford, MI
Bid Date: Jan 23 2020
Milford, MI
Bid Date: Mar 07 2024
Milford, MI
Bid Date: Feb 14 2024
Milford, MI
Bid Date: Apr 17 2024
Milford, MI
Bid Date: Apr 30 2024
Milford, MI
Bid Date: May 28 2024
Milford, MI
Bid Date: May 29 2024
Milford, MI
Bid Date: Jul 10 2024
Milford, MI
Bid Date: Dec 07 2023
Milford, MI
Bid Date: Oct 06 2023
Milford, MI
Bid Date: Sep 26 2023
Milford, MI
Bid Date: Jun 23 2022
Milford, MI
Bid Date: Mar 22 2022
Milford, MI
Bid Date: Mar 22 2022
Milford, MI
Bid Date: Sep 30 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.