BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2024 at 7:00 PM

Updated March 9, 2024

Demolition, site work and new construction of a water / sewer project in Abington, Massachusetts. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

The work includes but is not necessarily limited to demolishing existing pump station and installing new prefabricated pump station including pumps and controls, new generator, and new electrical enclosure. Estimated Cost $600,000 Question Deadline 02/09/2024 All questions about the meaning or intent of the Contract Documents shall be received in writing by the ENGINEER, Attn: Jill Rossini, Kleinfelder (jrossini@kleinfelder.com) at least ten days before the date set herein for the opening of bids.

Bid Results

Water / Sewer

$584,000.00

Public - City

Demolition, New Construction, Site Work

17

10

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
193
Bidding Soon
3,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

Project location map

350 Summer St, Abington, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.