Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Greenfield, Massachusetts. Completed plans call for the renovation of a municipal facility.
City Hall Chimney Repairs. Estimated Cost $50,000 work consists of removing the existing deteriorated clay tile lining of the flue gas chimney and relining with a stainless steel insulated liner, rebuilding the top portion and repointing the lower portion above the roof line, and related work. The project consists of the following work: Removal of the deteriorated/partially collapsed clay liner of the flue gas chimney. Installation of a stainless steel insulated liner. Rebuilding of the top portion of the chimney and repointing the remaining brick as necessary above the roof line. The chimney at City Hall serves to remove flue gasses from a natural gas fired steam boiler. Moisture and flue gasses in the range of 300-500 degrees F have deteriorated the original clay tile liner to the point that it has partially collapsed inside the chimney. As well, constant expansion and contraction has caused mortar joints to fail on the chimney itself. The work consists of total removal of any remaining clay liner and replacement with a 316T stainless steel insulated liner, complete with 20 gauge 316 stainless steel crown chase cover and rain cap to prevent further water infiltration. The transition section joining liner to boiler flue box shall be a custom 20 gauge stainless steel tee section with condensation drain and supports. Any questions regarding the bid need to be submitted in writing to Alan Twarog, Alan.Twarog@Greenfield-MA.gov by 10:00 AM Wednesday January 24, 2024. Upon further inspection, it has been determined that the entirety of the brick chimney will need to be rebuilt from approximately 4 feet below the roof line and up (approximately 20 feet). The flue from the boiler penetrates into the chimney about 18 inches and then turns 90 degrees and extends upward about 24 inches before transitioning to square brick. Approximately 6 to 7 feet of the old clay liner has been removed up from where the boiler flue ends. The remainder of the existing clay liner will need to be completely removed prior to installation of the new stainless steel liner. The existing IT equipment mounted to the side of the chimney shall be removed by the contractor and set aside for salvage by the City and shall not be re-mounted. Attached are photos documenting existing conditions.
Bid Results
Municipal
$64,742.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
February 1, 2024
March 4, 2024
14 Court Square, Greenfield, MA
Related To This Project
Greenfield, MA
Bid Date: Feb 26 2024
Greenfield, MA
Bid Date: Oct 19 2021
Greenfield, MA
Bid Date: Oct 26 2021
Greenfield, MA
Bid Date: Feb 22 2024
Greenfield, MA
Bid Date: Feb 29 2024
Greenfield, MA
Bid Date: Feb 29 2024
Greenfield, MA
Bid Date: Mar 20 2024
Greenfield, MA
Bid Date: Mar 29 2024
Greenfield, MA
Bid Date: Feb 14 2024
Greenfield, MA
Bid Date: Feb 14 2024
Greenfield, MA
Bid Date: Jan 25 2024
Greenfield, MA
Bid Date: Jun 03 2021
Greenfield, MA
Bid Date: Dec 28 2023
Greenfield, MA
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--