Published April 19, 2024 at 8:00 PM

Updated September 21, 2024

Site work and paving for a mixed-use development in Brooklyn Center, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Item Quantity Concrete Curb and Gutter 20,200 LIN FT Full Depth Reclamation 73,000 SY Repair Sewer Pipe 35 EACH Relocate Street Light 5 EACH Bituminous Pavement 14,000 TON Concrete Walk 5,000 SF Lining Sewer Pipe 8,900 LIN FT Sodding Type Lawn 16,000 SY 1" Type K Copper Pipe 7,700 LIN FT HDPE Pipe Sewer 600 LF Watermain Ductile Iron CL 52 14,000 LIN FT DESCRIPTION OF WORK This project generally consists of street and utility reconstruction work within the project area commonly referred to as the Orchard Lane East Neighborhood. The proposed work is generally described as follows: Reclaim bituminous surface, remove and replace some areas of sanitary sewer, line other areas of sanitary sewer, install temporary water systems, remove and replace water main, hydrants, services and valves. Install areas of new storm sewer system, removing the existing storm sewer system in those areas. Remove and replace driveway aprons, install concrete curb and gutter. Install bituminous surfacing and restore all disturbed areas with lawn sod. Contract shall be substantially completed by October 15, 2025 Final Completion Date: November 5, 2025 - All work must be completed Each proposal must have with it a certified check or bid bond payable to the city of Brooklyn Center in the amount of five [5] percent of the bid as a guarantee the bidder will enter into a contract with the city of Brooklyn Center in accordance with the terms of the bid, in case the bidder is awarded the contract. Direct inquiries to: Nick Turner, Alliant Engineering 612-767-9350 nturner@alliant-inc.com No questions will be answered within 48 hours of bid opening. The city reserves the right to accept or reject any or all bids and to waive minor irregularities.

Award

Roads / Highways

$8,193,703.00

Public - City

Paving, Site Work

5

9

11

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
136
Bidding Soon
1,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

Project location map

Orchard Ln N, Brooklyn Center, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.