BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ankeny, Iowa. Completed plans call for site work for a water / sewer project.

The SE 3rd Street Utility Improvements Phase 2 project includes the replacement of PCC street pavement, sanitary sewer, water main, and storm sewer located on SE 3rd Street, from S Ankeny Boulevard to SE Sharon Drive. The construction improvements include approximately 5,090 SY of 8 thick PCC street pavement, 1,350 LF of sanitary sewer, 1,615 LF of storm sewer, 1,220 LF of water main, 2,460 LF of footing drain collector, Class 10 excavation, subgrade preparation, modified subbase, and removal and replacement of driveways and sidewalks. Other associated improvements include temporary water main, temporary sidewalk, temporary traffic control, erosion control, seeding and fertilizing, mobilization, and miscellaneous associated work necessary to complete the project. project at its meeting at 5:30 P.M. on the 19 th day of February, 2024, in the City Council Chambers, Ankeny Kirkendall Public Library, 1250 SW District Drive, Ankeny, Iowa, 50023. City of Ankeny City Council meetings are open for the public to attend in person. City Council meetings are also conducted virtually and interested persons may attend the meeting virtually by the following methods: 1. Join Meeting Electronically: https://zoom.us/j/97312992966pwd=OEFocWZGS0NYUmtnVHNxcWZFak9Pdz09 Meeting ID: 973 1299 2966 Passcode: 1234 2. Join Meeting by Phone: Dial: +1 312 626 6799 Meeting ID: 973 1299 2966 Passcode: 1234

Bid Results

Water / Sewer

$2,244,000.00

Public - City

Site Work

87

6

2

11

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
45
Bidding Soon
469
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 18, 2024

img_map_placeholder

SE 3rd St, Ankeny, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.