BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2024 at 8:00 PM

Updated March 19, 2024

Site work for a playground / park / athletic field in Saint Louis, Missouri. Completed plans call for site work for a playground / park / athletic field.

Mississippi Greenway: NPS Camera Replacements (897B): in Gateway Arch National Park in St. Louis, Missouri. This work consists of replacing up to 35 security cameras and includes furnishing all material, labor, tools, equipment, and supervision necessary for the construction of the items herein described, in accordance with all the requirements represented in the attached drawings and the specifications. . Participation Goals for the project are 25% MBE and 5% WBE. The District reserves the right to waive informalities in bids, and to reject any and all bids submitted. Question Deadline 02/13/2024 at 5:00 PM CT

Award

Playgrounds / Parks / Athletic Fields

$123,444.00

Public - County

Site Work

6

5

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
84
Bidding Soon
1,268
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

Project location map

38 Washington Ter, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.