BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Watsonville, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of February 10, 2024, the bid was postponed due to their bidding process. Will rebid on February 27, 2024.** 5% SMALL BUSINESS PREFERENCE PROGRAM Information regarding TACPA including bidder questions about eligibility, please contact: The State of California Receptionist: (916) 375-4940 Department of General Services Procurement Division - Dispute Resolution Unit 707 Third Street, Second Floor West Sacramento, CA 95605 Worksite Eligibility Determinations: TACPA@dgs.ca.gov Estimate: $ 135,000.00 Furnish all labor, materials, tools and equipment necessary to make road improvements including slurry seal, patching, and striping in up to nine (9) sites throughout the District. Work to be performed throughout the Santa Cruz District, within Santa Cruz and San Mateo Counties in accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date. The contractor agrees to complete all the work within one hundred and twenty (120) calendar days from the date of written notice to commence work. This includes the ten (10) calendar days allowed for the Contractor to begin work. The contract term for this agreement is March 1, 2024 (or upon DPR approval whichever is later) through one (1) year from Notice to Proceed. Attendees will meet at Palm Beach (south of Sunset State Beach) Palm Beach State Park Entrance Station, 2660 Beach Rd, Watsonville, CA 95076. Attendees should arrive approximately fifteen (15) minutes early (8:45 AM) to sign in and allow time to provide your business card and receive a bid booklet (if needed). Striping only sites will not be visited. Attendees must be present during the entire walk-through, and attendance will be confirmed on the Contractors' Sign-In Log. For further information regarding Henry Cowell Redwoods State Park or Portola Redwoods State Park please contact: Juan Villarino, Park Maintenance Chief at (831)335-6311. For further information regarding Half Moon Bay State Beach, Pescadero State Beach, or Montara State Beach please contact: Bruce Meyer, Park Maintenance Chief at (650) 726-8818. For Information regarding Natural Bridges State Beach, Manresa State Beach, Palm Beach State Beach, or Seacliff State Beach, please contact: Augustine Ceballos, Park Maintenance Chief at (831) 429-2859 Q&A: Any question(s) concerning this bid solicitation after the job walk-through has been held must be submitted to G.G-Miksicek@parks.ca.gov. Responses will be included as an Addendum to this solicitation. Questions will be accepted up to 4:00 PM, Wednesday, January 11, 2024. In no event shall the SB preference or non-SB subcontracting preference exceed $50,000 in any single bid. Information regarding TACPA including bidder questions about eligibility, please contact: The State of California Receptionist: (916) 375-4940 Department of General Services Procurement Division - Dispute Resolution Unit 707 Third Street, Second Floor Worksite Eligibility Determinations: West Sacramento, CA 95605 TACPA@dgs.ca.gov Project Description a. The purpose of this contract is to make road improvements including slurry seal, patching, and striping in up to nine (9) sites listed under Site Locations below. Work to be performed throughout the Santa Cruz District, within Santa Cruz and San Mateo Counties. All work shall be completed according to the plans and specifications included in this contract, and as directed by the States Representative (Representative). b. Site Location(s): 1. Palm Beach SB, Parking Lot (Slurry/Stripe) 2660 Beach Rd, Watsonville CA 95076 2. Natural Bridges SB, Day Use Lot (Slurry/Stripe) 2531 W. Cliff Dr, Santa Cruz ,CA 95060 3. Henry Cowell Redwoods SP, Lot 1 (Slurry, Stripe) 303 Big Trees Park Rd, Felton CA 95018 4. Portola Redwoods SP, WWTP Road (Patch/ Slurry) 9000 Portola State Park Road, La Honda, CA 94020 5. Pescadero SB, Central Parking Lot (Slurry, Stripe) Cabrillo Hwy, Pescadero, CA 94060 6. (Alternate 1) Montara SB, Parking Lot (Stripe) 19369 Cabrillo Hwy. S, San Gregorio, CA 94074 7. (Alternate 2) Manresa SB, Day Use lot (Stripe) 1445 San Andreas Rd, Watsonville CA 95076 8. (Alternate 3) Seacliff SB, Upper Day Use lot (Stripe) State Park Dr, Aptos CA, 95003 9. (Alternate 4) Half Moon Bay SB, Francis Day Use parking (Stripe) 95 Kelly Ave. Half Moon Bay, CA 94019 For further information regarding Henry Cowell Redwoods State Park or Portola Redwoods State Park please contact: Juan Villarino, Park Maintenance Chief at (831)335-6311. For further information regarding Half Moon Bay State Beach, Pescadero State Beach, or Montara State Beach please contact: Bruce Meyer, Park Maintenance Chief at (650) 726-8818. For Information regarding Natural Bridges State Beach, Manresa State Beach, Palm Beach State Beach, or Seacliff State Beach, please contact: Augustine Ceballos, Park Maintenance Chief at (831) 429-2859 The contractor agrees to complete all the work within one hundred and twenty (120) calendar days from the date of written notice to commence work.

Award

Sidewalks / Parking Lot

$144,584.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
1,306
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

April 15, 2024

img_map_placeholder

2660 Beach Rd, Watsonville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.