Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Merna, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
2024 Greendale Street & Utilities Rehabilitation Program. The electronic bid form will be available for completion beginning Wednesday, January 24, 2024. A certified check or bid bond payable without condition to the Village of Greendale in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted a proper contract and bond will be executed and filed within 10 days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. No bid shall be withdrawn after the opening of bids without the consent of the Village of Greendale for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, he shall be bound by the terms of acceptance hereinafter contained. The Village of Greendale reserves the right to reject any or all bids received or to accept any bid which may be to the best interest of the Village. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of the contract. QUESTIONS ABOUT THIS PROJECT PLEASE CONTACT: LEN J. ROECKER, P.E., P.L.S. VILLAGE ENGINEER - GREENDALE Bids shall include the furnishing and installation of all labor, materials, permits, equipment, tools, supplies, etc., for complete operating installation of the 2024 Street and Utilities Rehabilitation Program. \ Approximate quantities of work on the 2024 Street and Utilities Rehabilitation Program to be expected are as follows: \ BASE BID (Greenmeadow Lane, Eastway Parking Lane, Euston Street, Sterling Court & Various Locations) \ 60 LF - 12" Storm Sewer \ 68 LF - 4" PVC C900 DR 18 Perforated Underdrain \ 380 LF - 4" PVC SDR 26 Perforated Underdrain \ 85 LF - 6" PVC SDR 26 Perforated Draintile \ 2 EA - Storm Structure Adjustment \ 3 EA - Storm Structure Rehabilitation \ 3 EA - Sanitary Manhole Adjustment \ 2 EA - Sanitary Manhole Rehabilitation \ 318 SY - Geotextile HDPE Impermeable Liner (60 mils) \ 6,500 SY - Milling Pavement \ 1,600 LF - Pavement Sawing \ 2,300 SF - Remove Concrete Walk \ 5,100 SF - Remove Concrete Driveway \ 2,800 LF - Remove Concrete Curb & Gutter \ 340 LF - Remove Concrete Curb & Gutter Head \ 2,230 SF - 5" Concrete Walk \ 5,100 SF - 7" Concrete Driveway \ 2,430 LF - 24" Mountable Concrete Curb & Gutter \ 840 LF - 31" Concrete Curb & Gutter \ 100 SF - Yellow, Curb Ramp, Detectable Warning Field \ 200 SY - Permeable Pavers (3 1/8" Thick) \ 1,975 CY - Excavation \ 2,250 TON - 1 1/4" Crushed Aggregate Base \ 980 TON - Breaker Run \ 720 TON - HMA Pavement (3 LT 58-28 S) \ 270 TON - HMA Pavement Leveling Course (5 LT 58-28 S) \ 790 TON - HMA Pavement (5 LT 58-28 S) \ 1,100 SY - Sod \ ALTERNATE A - (Foxley Court) \ 1,070 SY - Milling Pavement \ 100 LF - Pavement Sawing \ 470 SF - Remove Concrete Driveway \ 205 LF - Remove Concrete Curb & Gutter \ 470 SF - 7" Concrete Driveway \ 145 CY - Excavation \ 150 TON - 1 1/4" Crushed Aggregate Base \ 110 TON - Breaker Run \ 70 TON - HMA Pavement (3 LT 58-28 S) \ 130 TON - HMA Pavement (5 LT 58-28 S) \ 195 SY - Sod Restoration \ ALTERNATE B (Forest Court) \ 580 SY - Milling Pavement \ 100 LF - Pavement Sawing \ 520 SF - Remove Concrete Driveway \ 30 LF - Remove Concrete Curb & Gutter \ 520 SF - 7" Concrete Driveway \ 50 LF - 24" Mountable Curb & Gutter \ 70 CY - Excavation \ 80 TON - 1 1/4" Crushed Aggregate Base \ 60 TON - Breaker Run \ 30 TON - HMA Pavement (3 LT 58-28 S) \ 70 TON - HMA Pavement (5 LT 58-28 S) \ 90 SY - Sod Restoration \ Together with appurtenant construction. Authority to publish this project was granted by the Village Board of the Village of Greendale, Milwaukee County, Wisconsin. \ Melanie Van Kauwenberg, Village Clerk
Award
Roads / Highways
$795,710.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2024
May 1, 2024
Multiple Locations, Merna, NE
Related To This Project
Merna, NE
Bid Date: Mar 01 2024
Merna, NE
Bid Date: Feb 21 2024
Merna, NE
--
Merna, NE
--
Merna, NE
Bid Date: May 15 2024
Merna, NE
Bid Date: May 15 2024
Merna, NE
Bid Date: Jun 06 2024
Merna, NE
Bid Date: Aug 07 2024
Merna, NE
Bid Date: Jan 11 2024
Merna, NE
Bid Date: Feb 22 2022
Merna, NE
--
Merna, NE
Bid Date: Jun 28 2023
Merna, NE
--
Merna, NE
Bid Date: Jun 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.