Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct District SCADA Improvement for Barker-Cypress Municipal Utility District including, but not limited to mobilization, bonds and insurance, permits and all else shown below. Water Plant No. 3: The replacement of existing Autosensory panel; the installation of PLC Panel, HMI and SCADA Server tower; the removal of existing chemical analyzer and the installation of ChemScan system. Lakes of Forest Pine Lift Station: The replacement of lift station control panel with SCADA capabilities, terminal boxes, safety grating, wet well vent flange and screen; the installation bypass pump and self-supporting antenna tower; blast and recoat aboveground piping and generator enclosure. The bidder shall submit a certified or cashiers check on a responsible bank in the State equal to two percent (2%) cashiers check or five percent (5%) bid bond of the maximum total bid amount. Make the cashiers check or bid bond payable to the Owner. Bidder must be capable of executing a satisfactory performance bond and payment bond for 100 percent (100%) of the contract sum in accord with the conditions of the contract. The Owner is not obligated to accept the lowest bid or any bid. The Owner reserves the right to reject any or all bids and to waive any informalities in bids or in bidding. The Owner may accept any bid deemed advantageous. The contract award may include full consideration of unit prices and alternates. No bid may be withdrawn until the expiration of 60 calendar days from the date bids are open. Questions must be submitted electronically. Questions will not be considered after 12:00 p.m., noon, three (3) business days prior to bidding. SCOPE OF WORK A. The Contractor shall procure the services of a Process Control System Supplier (PCSS) to furnish and install all materials, equipment, labor and services, required to achieve a fully integrated and operational system as specified herein, in the Specification Sections listed below, and in related drawings, except for those services and materials specifically noted. 1. Section No Title 13301 Testing 13303 Training 13310 Computer System Hardware 13311 PLC Hardware and Software 13315 HMI System Software 13320 Control and Data Network Equipment 13330 Control Panels and Panel Mounted Equipment 13335 Control Panel Uninterruptible Power Supply (Single-Phase) 13340 Instruments 13350 Wireless Radio Communication System B. Items specifically excluded from the scope include the following: 1. PLC programming and Human Machine Interface (HMI) graphics development. C. Auxiliary and accessory devices necessary for system operation or performance, such as transducers, relays, signal amplifiers, intrinsic safety barriers, signal isolators, software, and drivers to interface with existing equipment or equipment provided by others under other Sections of these specifications, shall be included whether they are shown on the Drawings or not. D. All equipment and installations shall satisfy applicable Federal, State and local codes. E. Use the equipment, instrument, and loop numbering scheme shown on the Drawings and specifications in the development of the submittals. Do not deviate from or modify the numbering scheme without the Engineer's approval.

Bid Results

Water / Sewer

$842,369.00

Public - City

Site Work

26

17

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Decorative Metal
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Power Filters and Conditioners, Capacitors, Electrical and Cathodic Protection, Facility Lightning Protection
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
70
Bidding Soon
2,806
All Active Projects
1,033
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

March 11, 2024

img_map_placeholder

Multiple Locations, Houston, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.