Site work, paving and outdoor lighting for a mixed-use development in Hempstead, Texas. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a bridge / tunnel; sidewalk / parking lot; and water / sewer project.

The site work contractor is responsible for all site work, including but not limited to clearing and grubbing of the site; construction of brick fence; a sixteen-foot (16') diameter concrete lift station wet well complete with three (3) submersible pumps with all accessories, riser piping, valves, coatings and supports; yard piping, influent piping; effluent piping and outfall; manholes; site work; storm piping and outfalls; crushed concrete roads and IWTP pad; protective coatings, concrete pads; swales, culverts, and inlets; new utility electrical service; service entrance equipment; diesel generator and automatic transfer switch; 480V distribution panelboard; 120/240V panelboard; transformer; lighting contactor panel; autodialer; SPD; site lighting; electrical rack and supports; electrical manholes; underground duct banks with wires and conduits; terminal boxes at Aeration Basin No. 2; wires and conduits from the terminal boxes at Aeration Basin No. 2 to the electrical rack; installation of the PLC panel at the rack; lift station control panel; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The lease of the 200,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; sodium hypochlorite disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Aeration Basin No. 2); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the force main piping upstream of the manual bar screen and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor is responsible for any underground duct banks and underground conduit between leased local control panels and leased field equipment unless stated otherwise on the plans. The lessor is responsible for all wiring between the leased local control panels and leased field equipment and for all above ground conduit between the leased local control panels and leased field equipment unless stated otherwise on the plans. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. Each Bid must be accompanied by a Bid bond or a certified or cashieris check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier's check is provided, the successful bidder shall deliver, at 6330 West Loop South, Suite 150, Bellaire, Texas 77401, the original certified or cashier's check within one (1) business day of receipt of the bid opening. Bidder must submit its Bid and Bid Securities in compliance with Owner is Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and Bid Securities must be submitted through online. Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website. By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner is Electronic Signature Rules for Construction Contracts. The deadline to ask questions is 2/10/2024 2:00 PM CST The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board is judgment will be most advantageous to the District and result in the best and most economical completion of the Project. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price.

Post-Bid

Water / Sewer

$4,600,000.00

Public - County

Outdoor Lighting, Paving, Site Work

63

21

31

4

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
213
Bidding Soon
4,450
All Active Projects
1,818
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 13, 2024

April 15, 2024

January 3, 2025

img_map_placeholder

Multiple Locations, Hempstead, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.