BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Birmingham, Alabama. Completed plans call for site work for a road / highway; and water / sewer project.

The award of this Contract will be made pursuant to Alabama Code: 39-1-1, et seq. (Public Works). The Principal Items of Work related to this project are: Description Unit Amount Mobilization LS 1 Existing 36 Corrugated Metal Pipe Removal LF 37 Install 36 Class II, Wall B Reinforced Concrete Pipe LF 37 Install 36 Precast Concrete Headwall EA1 Rebuild Existing Concrete Headwall LS 1 Clean & CCTV Existing 24 Reinforced Concrete Pipe LF 41 Traffic Control LS 1. Any cost for reproduction shall be the responsibility of bidders. Prospective bidders are advised to check their source of bid documents frequently for any addenda to the bid documents. It is the bidders responsibility to bid on the correct set of bid documents. Bids shall be accompanied by a cashiers check drawn on an Alabama bank, or a bid bond executed by a surety company duly authorized and qualified to make such bonds in the State of Alabama, in an amount equal to 5% of the bid (subject to a maximum of $10,000) and payable to the City of Birmingham. Bid bonds of the three (3) lowest bidders will be held for a period of ninety (90) days unless bidders agree, in writing, to a longer period of time. No bid may be withdrawn after the scheduled closing time for receipt of bids and for a period of ninety (90) days thereafter. A performance bond equal to 100% of the contract amount and a payment bond equal to 100% of the contract amount will be required of the successful bidder. Said bonds shall be executed by a surety company duly authorized and qualified to make such bonds in the State of Alabama. Liability insurance certificates shall be required of the successful bidder and such certificates shall list the City of Birmingham, its officials, agents, and employees as additional named insured. Only bids submitted by General Contractors licensed in the State of Alabama in accordance with Alabama Code (2006 or later as amended) Chapter 8, Title 34 (inclusive) will be considered. Bids shall be submitted in a sealed envelope marked SEALED BID 509 MAPLE STREET STORM SEWER REPLACEMENT. Contractors shall write on the outside of the sealed bid envelope his or her State of Alabama general contractor's license number as well as the name of the company submitting the bid. The sealed bid envelope shall contain the following documents: (1) the Form of Proposal, (2) the Authorization to execute the Form of Proposal, (3) bid bond, (4) MBE/DBE Forms A, C and D and (5) a copy of the Contractors State of Alabama General Contractor's License. Special attention is called to the applicability of the Birmingham Plan-Construction Industry Program to this project. Under this Program the utilization of Minority Business Enterprises and Disadvantaged Business Enterprises (""MBE/DBE"") is encouraged on a voluntary basis. The Construction Industry Authority establishes a system of floating MBE/DBE goals which may differ from year to year and project to project. Overall, these goals shall not be less than the historical participation of MBE/DBE's in construction projects of the City and its agencies. Additional information about this Program may be obtained from the Executive Director, Birmingham Construction Industry Authority at 601 37th Street South, Birmingham, AL, 35222; telephone (205) 324-6202. For federally funded contracts, the provisions of the President's Executive Order 11246 and federal agency regulations requiring affirmative action to achieve employment and utilization of minority persons and businesses, and the Davis-Bacon Act provisions are applicable. As a matter of public policy, the City of Birmingham agrees to make opportunities available to the maximum extent possible, to actively include Historically Underutilized Business Enterprises (HUBEs) such as architectural firms, engineering firms, investment banking firms, other professional consultant services providers, and construction contractors as part of business, economic and community revitalization programs. It is the bidder's responsibility to make sure that his bid is in the possession of the City Engineer on or before 2:00 p.m., February 7, 2024. Bids received after this time will not be considered. Bids can be dropped into the Bid Box located in Room 220 City Hall, delivered to the City Engineer in Room 220 City Hall or brought to the bid opening. The City of Birmingham reserves the right to reject any or all bids and to waive any informality in any bid. Question Deadline : 02/02/2024 5:00PM CDT Question deadline added as per Addendum 1. Questions must be received in writing and should be addressed to Ronald Wilson : ron.wilson@birminghamal.gov.

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
34
Bidding Soon
559
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

March 8, 2024

img_map_placeholder

509 Maple St, Birmingham, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.