Renovation of an educational facility in Washington, District of Columbia. Completed plans call for the renovation of a educational facility.
RFP Questions due to the Department: January 23, 2024, at 2:00 P.M The District of Columbia ("District") Department of General Services (the "Department" or "DGS"), on behalf of District of Columbia Public Schools ("DCPS"), is issuing this Request for Proposals ("RFP") to solicit design build proposals ("Proposal(s)") from offerors ("Offeror(s)") interested in serving as the design-builder (the "Design-Builder" or the "Contractor") for the Meyer Elementary School - heating ventilation, and air conditioning ("HVAC") upgrades, located at 2501 11th Street NW, Washington, DC 20001 (the "Project"). The Department anticipates awarding a design-build contract to the Offeror whose Proposal is most advantageous to the District pursuant to the evaluation and award criteria in Part 3 of this RFP. The Project includes full design and construction services for upgrades to the existing school while the school is occupied. The upgrades shall include HVAC replacement, electrical heavy-up, new ceilings, and lights. This Project shall consider the DC Building Energy Performance Standards ("BEPS") program and the Carbon Free DC 2050 initiative. The goal of these programs is to make the District carbon-neutral by 2050. The net-zero emissions ("NZE") requirement and the overarching quest toward electrification shall be factored into the design. The newly installed systems and accouterments are expected to be maintained and incorporated into the modernized building. It is anticipated that the HVAC systems in the modernized building will be a geothermal system utilizing a well field located at the adjacent athletic field. The systems designed under this Project should be designed to be converted to ground-source systems in the future. DGS anticipates the construction portion of the Project to span over two or three summers. However, the Contractor shall anticipate that some work shall be performed during the school year while the building is occupied. As such, the Project shall be designed and scheduled to be implemented in phases based on spaces available to perform work, equipment availability, and task duration. Stop-gap measures will be required to improve occupant comfort, including installing controls on the existing steam system to operate based on the outdoor temperature (outdoor temperature reset). The new HVAC systems should be hydronic with a central plant designed to accommodate a chiller, boiler, heat exchanger, well field manifold, pumps, etc., as required. Forcedair terminal units shall be ducted to architectural air devices and diffusers. Ventilation shall be provided by Dedicated Outdoor Air Systems ("DOAS") specified with energy recovery and designed with ducted or plenum returns. The big-box spaces shall be served by dedicated, variable volume ERUs and AHUs. In addition, conditioning of ancillary areas like restrooms, stairwells, and MDF/IDF rooms shall conform to DCPS standards. The Department is allocating a budget of $11,500,000.00 for this Project ("Project Budget") for full services of design, construction, and inspections. The Offeror shall assume approximately 100% of the design and construction budget will be available in Fiscal Year ("FY") 2024. Accordingly, Offerors are to base their Proposals on the approved budget. The Department requires that this Project will start upon execution of the Notice to Proceed ("NTP") issued by the Contracting Officer ("Contracting Officer" or "CO") and be ready for staff, teachers, and students for the 2026/2027 school year as further described in Section 1.6 of the RFP. However, the contract between the Department and the Design-Builder ("Agreement," "Contract" or "DesignBuild Agreement") will require submission to and approval by the Council of the District of Columbia. As part of the Project Budget, the Offeror's proposal shall include the following: Permit Allowance ($45,000.00), Utility Allowance ($50,000.00), and an Owner's Directed Allowance of $255,000. Contract or NTP/Design Start May 1, 2024 Concept Design Package Submission 4 weeks or earlier from NTP Early Start Agreement Issued June 20, 2024 GMP Proposal Approval July 20, 2024 Substantial Completion Date August 17, 2026 Final Completion Date June 15, 2027 Administrative Completion Date December 30, 2027 9.0 Bid Bond Offerors are required to submit with their Proposals a bid bond in the amount of five percent (5%) of the total price proposal in the form included as Attachment G. All bonding companies must be included on the Department of Treasury's Listing of Approved Sureties. Alternatively, Offerors may submit a cashier's check in lieu of a bid bond. However, in the event an Offeror who is awarded the Agreement fails to post a payment and performance bond for the full value of the Agreement, the Offeror shall thereby forfeit the full amount of the cashier's check. If the Offeror chooses to submit a cashier's check in lieu of a bid bond, the Offeror must complete the form included as Attachment O and return, notarized, with the Offeror's Proposal. 9.1 Contractor's Payment and Performance Bond The Design-Builder will be required to post a payment and performance bond having a penal value equal to the Agreement amount at the time the Agreement is executed. The Design-Builder will be required to post an updated payment and performance bonds in the form of Attachment T to reflect the GMP Amendment amount.
Award
Educational
$1,930,925.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2024
June 25, 2024
2501 11th St NW, Washington, DC
Related To This Project
Washington, DC
Bid Date: Feb 01 2024
Washington, DC
Bid Date: Feb 21 2024
Washington, DC
Bid Date: Oct 03 2024
Washington, DC
--
Washington, DC
Bid Date: Dec 20 2023
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jul 29 2024
Washington, DC
Bid Date: Mar 26 2024
Washington, DC
Bid Date: Jun 07 2024
Washington, DC
Bid Date: Feb 05 2024
Washington, DC
--
Washington, DC
Bid Date: Jan 19 2024
Washington, DC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.