Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a museum in Washington, District of Columbia. Completed plans call for the construction of a museum; and for site work for a museum.
https://www.bizjournals.com/washington/news/2024/09/09/hyl-architecture-perkins-will-merger-dc.html HYL Architecture, a top Greater Washington interior design firm, has closed a deal to merge with global architecture giant Perkins&Will. The merger will grow Perkins&Will's D.C. office from about 50 to 80 employees and allow the firm to tap into new markets that have existing relationships with D.C.-based HYL. Terms were not disclosed. The HYL brand will soon be dissolved as the studio integrates with Perkins&Will. Its D.C.-based team will move next year from its office at 607 14th St. NW into the Perkins&Will studio at 1222 22nd St. NW. HYL founder and CEO Catherine Heath will take on the role of Northeast regional practice leader for the workplace at Perkins&Will. She will focus on building relationships with law firms and other corporate clients up the East Coast. "We have been looking for a way to scale up our studio to serve our clients nationally and internationally," Heath said in a statement. "Joining Perkins&Will is a strategic move that will allow us to focus our time on design excellence and client service while also expanding our capabilities through complementary services." HYL ranked as the 15th largest interior design firm in Greater Washington in 2023, according to Washington Business Journal research, with $8.77 million in billings. Damon Sheppard, managing director of Perkins&Will's D.C. studio, said in an interview that the deal came together quickly, only over the past 30 days, through mutual friends at Perkins&Will. "Over time, we'll begin to start combining teams, doing projects together ... and ultimately we'll operate as one studio that's bigger, with a larger body of leadership," Sheppard told me. Other members of HYL's leadership team will also assume roles at Perkins&Will, according to Sheppard. Three HYL staff members will join Perkins&Will's New York studio, and two will join the firm's Seattle studio. Perkins&Will is the firm behind the Bezos Learning Center, a planned addition to the National Air and Space Museum. Perkins&Will has studios spanning the globe including Calgary, Sao Paulo, Shanghai and Singapore. The firm is is best known locally for its work on the Smithsonian Institution's National Museum of African American History and Culture, the Bezos Learning Center at the National Air and Space Museum, and D.C.'s Southwest Library. HYL's local portfolio includes the D.C. law offices of Williams & Connolly, Arnold & Porter and Wiley; Peraton's Reston offices; and the D.C. and New York offices of The Carlyle Group Inc. _______________ The Smithsonian Institution is soliciting for a Construction Management at Risk Contract (CMc) for the construction of the Bezos Learning Center (BLC) at the Smithsonian National Air and Space Museum (NASM), located in Washington, DC. The proposed contract listed here is UNRESTRICTED. All responsible sources are encouraged to submit a proposal, which will be considered by the Smithsonian. The new Bezos Learning Center (BLC) will be a pan-Institutional resource that will be overseen by the NASM Director and the Associate Director for Education and Visitor Experience. A primary focus of its programs shall reach underserved communities in Washington, DC and across the nation, both at the site of the new facility and virtually through remote capabilities, as the Center will employ the latest technological resources and developments available. Other ancillary programming will take place within and surrounding the facility, such as a 600- to 700-seat quick-service (fast casual) restaurant accessible from the Museum's main level as well as an Astronomy Park and Observatory on the East Terrace. The permanent installation of the currently temporary Phoebe Waterman Haas Public Observatory shall be addressed as an integral part of the overall BLC project efforts. The Smithsonian anticipates awarding a contract for pre-construction services by August 2024 and commencing of site preparation activity in early 2025. The Smithsonian expects contractor turnover of the building for the installation of exhibits starting in mid-2027 and the new BLC will open to the public in late 2027 to coincide with NASM 50th Anniversary. The selected CMc shall provide Pre-construction Phase Services and Construction Phase Services through a guaranteed maximum price (GMP) agreement. Total period of performance including Pre-construction and Construction is estimated to be from notice to proceed in September 2024 to substantial completion in May 2027. The estimated construction cost is between $72,000,000 and $76,000,000. Critical elements of the work include, but are not limited to; pre-construction services, site work, utility work, excavation, foundations, dewatering, concrete and steel super-structure, landscape and hardscape, high level architectural finishes (both interior and exterior), MEP systems, elevators, roofing, exterior curtain wall with unique façade treatment, food service equipment, and theater specialties. Additional requirements for performance include procedures and documentation to ensure compliance with the established LEED building criteria; practices, procedures and documentation related to integrated building commissioning; and experience with the procedures for the use of Building Information Modeling (BIM). Firm evaluation and selection will be conducted in accordance with FAR Part 15, Best Value Procurement, utilizing a two-step procurement model. Step One of the RFP will consist of a list of prequalifying criteria to assist the agency in identifying those CMc contractors that have demonstrated past specialized experience in comparable and non-comparable CMc projects and other relevant qualifying factors. It is the Smithsonian's intent to advance the most highly qualified companies for further consideration under Step Two, technical and pricing evaluation of the RFP. Companies which are advanced to Step Two of the RFP will be evaluated in accordance with the technical criteria as set forth in the RFP. The North American Industry Classification Code (NAICS) for this procurement is 236220 and the size standard under this code is $45 million average annual receipts over the last three years. This announcement is open to all businesses regardless of size. If the selected firm is a large business, a subcontracting plan consistent with PL 95-507, PL 99-661 and PL 100-656 will be required with the final fee proposal. A minimum goal of 40% of the total planned subcontracting dollars shall be placed with small business concerns. At least 10% of total planned subcontracting dollars shall be placed with Small disadvantaged businesses (SDB), including Historically Black Colleges and Universities or Minority Institutions; 10% with Women-owned small businesses (WOSB); 7% shall be placed with Hub-zone Small Businesses (HubZone), 7% with Veteran-owned small businesses (VOSB); and 7% with Service Disabled Veteran-owned small businesses (SDV). The subcontracting plan is required with this submittal. Any prime or joint venture found to be officially notified of non-compliance on past contracts and the non-compliance is outstanding will not be considered for this project. Failure to adequately explain reasons for not meeting previous contract goals may result in a lower overall rating and ultimate non-selection. An approved small business-subcontracting plan will be required prior to award. Prospective contractors must be registered in the Systems for Award Management (SAM) prior to award of a contract. Information on registration and annual confirmation requirements may be obtained via the Internet at http://www.sam.gov. Lack of registration in the SAM database will make an offeror ineligible for award. Davis Bacon Wage Determination DC20240002 (Building) and DC20240001 (Heavy) shall apply. Total period of performance for Preconstruction and Construction Services is 36 months from the date of Notice to Proceed. QUESTIONS/CLARIFICATIONS It is desired that all questions/clarifications be sent in, sequentially numbered for example first questions 1,2,3, second set of questions 4, 5, 6, etc. in word format to ChanVC@si.edu. It is requested that all questions be sent in no later than 3 PM Eastern Time on February 14, 2024. END OF AMENDMENT TEN Period of Performance: 01/22/2024 to 12/30/2027 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Museum
$76,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
September 30, 2024
600 Independence Ave SW, Washington, DC
Related To This Project
Washington, DC
Bid Date: Feb 07 2024
Washington, DC
Bid Date: Feb 01 2024
Washington, DC
Bid Date: Feb 21 2024
Washington, DC
Bid Date: Oct 03 2024
Washington, DC
--
Washington, DC
Bid Date: Dec 20 2023
Washington, DC
--
Washington, DC
Bid Date: Mar 26 2024
Washington, DC
Bid Date: Jun 07 2024
Washington, DC
Bid Date: Feb 05 2024
Washington, DC
--
Washington, DC
Bid Date: Jan 19 2024
Washington, DC
--
Washington, DC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.