BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in San Antonio, Texas. Working plans call for the demolition of a day care center; for the construction of a day care center; for site work for a day care center; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed project will be an unrestricted acquisition to design and construct a Child Development Center at Lackland AFB, TX The proposed project will be a competitive, firm-fixed price, Design-Build contract. Magnitude of Construction is between $25 Million and $100 Million. The solicitation (Phase 1) is anticipated to be issued on or about March 2024, and proposals due on or about April 2024. The contract is anticipated to be awarded on or about September 2024 To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at h ttps://www.sam.gov/. No state level certifications will be accepted. PROJECT INFORMATION: Construct a large child development center utilizing the standard facility design. The new facility will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen area and playground areas with equipment provided from other appropriations. The construction will consist of concrete foundation, concrete floor slabs, structural steel frame, masonry walls and standing seam metal roof. The project will include all utilities, site improvements, pavements, security systems, passive force protection measures to include perimeter fencing and lighting, and other supporting work necessary to make a complete and usable facility. This project will demolish Building 2602 (722 SM). The environmental remediation includes testing/removal of asbestos and lead-based paint and any work needed to mitigate potential hazards. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01. This solicitation will be evaluated under the Two-Phase Design Build Process in accordance with FAR 36.3-Two- Phase Design-Build Selection Procedures. In Phase 1, interested firms or joint venture entities (referred to as "Offerors") will submit a proposal demonstrating their past performance and capability to successfully execute this requirement. The Government will evaluate the performance capacity in accordance with the criteria described in the Phase 1 solicitation and intends to select no more than FIVE (5) of the Phase 1 offerors to compete in Phase 2. In Phase 2, the selected offerors will submit a technical proposal and a price proposal. The Government will evaluate the Phase 2 proposals, in accordance with the criteria described for Phase 2 in the solicitation, and award the contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal are determined to represent the overall "best value" to the Government, considering all technical and non-technical factors including cost or price identified under Phases 1 and 2. Anticipated project completion is 730 days from Notice to Proceed After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the following internet address: https://sam.gov/ and https://piee.eb.mil/. In order to download the solicitations and amendments in PIEE, there are 10 general steps a vendor must follow. A complete list can be viewed at the following site: https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5 For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. It is the Offerors responsibility to monitor the https://sam.gov/ and PIEE at https://piee.eb.mil web sites for amendments to the solicitation. You must be registered with the System Award for Management (SAM) and PIEE, to receive a government contract award. The Government reserves the right to use only the Internet as notification of any amendments to this solicitation. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Day Care Centers

$100,000,000.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
112
Bidding Soon
2,769
All Active Projects
1,063
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 19, 2024

April 20, 2026

img_map_placeholder

To Be Determined, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.