BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a conference / convention center in Bloomington, Indiana. Completed plans call for the addition of a conference / convention center; for the demolition of a conference / convention center; for the renovation of a conference / convention center; and for site work for a conference / convention center.

The Monroe County Capital Improvement Board of Managers ("Cib") is Seeking Qualified Contractors Pursuant to Indiana Code 5-32 - Employment of Construction Managers as Constructors for Projects (Cmc). The Cib is a 7person Entity Recently Created by the Monroe County Commissioners by Monroe County Ordinance 2023-24 as Authorized by State Statute Indiana Code 6-9-4 Et Seq. This Board Was Created in Collaboration With the City of Bloomington, to Manage All Elements Related to the Project. The Board is Comprised of Community-member Volunteers With Some Experience Related to Managing Significant Projects. Other Consultants, Including Architectural Firms, Legal and Financial Services, Bond Counsel, and the Plan Will Be to Retain a Project Manager/owner's Representative. The Selection Process Will Consist of Two Stages. the First Stage, Request for Qualifications (Rfq), Will Be an Initial Qualifications-based Review. From These Responses, Firms Will Be Selected to Proceed to the Next Stage. the Second Stage, Firms Will Be Selected and Invited to Interview. Project Summary the Design of the Project is in the Schematic Design Stage. the Objective of the Project is to Renovate the Existing Monroe County Convention Center and Design an Addition of Approximately 60,000 Square Feet on Adjacent Sites. the Project Will Include, but Not Limited to, Mechanical, Electrical, and Plumbing Systems, Fire Protection Systems, and Building Envelopes, as Well as Possible Connectors Between the Proposed Additions and the Existing Convention Center. Phase 1 Responses Evaluated; Shortlisted Firms Notified (2 Weeks) 02.14.2024 Phase 2 Interviews for Shortlisted Firms Week of 03.04.2024 Proposed Cmc Partner Confirmation / Cib Board Meeting 03.20.2024 Request for Qualifications the Selection Process Will Consist of Two Stages. the First Stage (Rfq) Will Be an Initial Qualifications Based Review. From These Responses, Firms Will Be Shortlisted to Proceed to the Next Stage. the Second Stage Firms Will Be Invited to Interview. the Total Package of the Response Shall Not Exceed 25 Pages and Be Offered in No Larger Than 11 X 17" Format. Corporate Qualifications and Experience Cover Letter - Letter Should Confirm That Offeror's Submittal is in Response to Phase 1 Request for Qualifications. Office Location - Location of Office in Charge of Project and Location of Other Project Team Member Offices, if Applicable. Include Appropriate Contact Information. Organization Chart - Organization Chart Showing the Project Team and Their Roles, Including All Sub-consultants or Partner Firms. if Partnering, Explain Who is Responsible for What on This Project and Any/all Referenced Projects. Safety Record - Provide Statement of Experience Modification Rate Within the Last Eight (8) Years. Bonding Capacity - Include Documentation From Your Bonding Agent or Surety Company Regarding Your Bonding Capacity. the Successful Cmc Will Be Required to Hold a Performance and Payment Bond for the Entire Guaranteed Maximum Price (Gmp) Amount. Mbe, Wbe, Vbe Participation - Identification of Any Partner Firms With the Listed Designations. the Cib Encourages and Promotes Meaningful Participation of Such Enterprises in All Professional Service Agreements. Cmc Experience/cm at Risk - List a Minimum of Three (3) Projects Within the Last Eight (8) Years Utilizing a Cmc Delivery With a Construction Value Greater Than $10 Million. a Special Emphasis Should Be Given to Convention Center Projects, Particularly Renovation and Additions to Existing Facilities. The Following Details Should Be Provided With Each Project: Staff and Their Role, Designer, Construction Costs, and Overview of Construction Schedule. Large Project Experience - List a Minimum of Three (3) Projects Within the Last Eight (8) Years With a Construction Value Greater Than $20 Million. the Following Details Should Be Provided With Each Project: Staff and Their Role, Designer, Construction Costs, and Overview of Construction Schedule. Recent Project Experience With Diverse Teams on the Construction Side - List a Minimum of Three (3) Projects Within the Last Eight (8) Years With a Construction Value Greater Than $5-10 Million and Their % of Diversity Participation. The Following Details Should Be Provided With Each Project: Teammates, Their Roles, % of Representation of Diversity Participation Upon Bid, % of Representation of Diversity Participation Upon Project Closeout. Be Prepared to Discuss Intent Vs. Actual Participation With Regard to Previous Projects. References - Provide at Least Three (3) Named Client References With Contact Information. Management Plan Describe the Process Through Which Your Organization Will Approach This Project. the Response Must Include Personnel Directly Involved in Proposal Generation, Project Management, Schedule, Financial Analyses, Cost Control, Life Cycle Analysis, and Transition Throughout Design and Construction. if Partnering, Explain Who is Responsible for What Tasks on This Project and on Previous Projects and Be Prepared to Discuss How the Participation Will Be Tracked for the Duration of the Project. Submittal Procedure Monroe County Capital Improvement Board of Managers Qualifications Shall Be Saved in Adobe Pdf Format and Titled as Follows: "[your Company Name] - Cmc Qualifications - Monroe Convention Center" The Cib Reserves the Right to Disqualify Any Submittal Received After the Time and Date Indicated Above. the Cib Reserves the Right to Select the Firm or Firms That Best Meets the Needs of the Cib Based on the Submitter's Qualifications and Experience. All Correspondence Regarding the Submittal Should Be Emailed to: James L. Whitlatch Partner Jwhit@lawbr.com Bunger & Robertson Attorneys at Law 211 South College Ave. | Bloomington, in 47404 Phone 812.332.9295 | Fax 812.331.8808 Direct 812.245.6016 I Cell 812.345.3491 Submittals That Are Incomplete, Do Not Follow the Format Requested Below, or Otherwise Unclear or Contrary to the Guidelines of This Request May Be Rejected as Non-responsive. If Selected, the Cmc Will Be Required to Enroll in and Verify the Work Eligibility Status of All Newly Hired Employees Through the E-verify Program. The Selected Cmc Shall Sign an Affidavit Affirming That Cmc Does Not Knowingly Employ an Unauthorized Alien. "Unauthorized Alien" is Defined at 8 U.s. Code 1324a(H)(3) as a Person Who is Not a U.s. Citizen or U.s. National and is Not Lawfully Admitted for Permanent Residence or Authorized to Work in the U.s. Under 8 U.s. Code Chapter 12 or by the U.s. Attorney General. Cmc if Selected Will Be Required to Certify That It Has Not, Nor Has Any Other Member, Representative, or Agent of Cmc, Entered Into Any Combination, Collusion, or Agreement With Any Person Relative to the Price to Be Offered by Any Person Nor Prevented Any Person From Making an Offer Nor Induced Anyone to Refrain From Making an Offer and That This Offer is Made Without Reference to Any Other Offer. Cmc Shall Sign an Affidavit Affirming That Cmc Has Not Engaged in Any Collusive Conduct. Cmc Shall Comply With City of Bloomington Ordinance 2.21.020 and All Other Federal, State and Local Laws and Regulations Governing Non-discrimination in All Regards, Including, but Not Limited to, Employment.

Post-Bid

Conference / Convention Centers

$4,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
85
Bidding Soon
1,179
All Active Projects
532
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

October 8, 2024

img_map_placeholder

302 S College Ave, Bloomington, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.