BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work Generally Includes, But Is Not Limited To The Following: Installation Of Asphalt Parking Areas With Concrete Curb/gutter, Retaining Walls, Sidewalks, Bike Racks, Restroom Facilities And Related Amenities The City Reserves The Right To Reject Any Or All Bids Or To Waive Any Informality Or Technicality In Any Bid If Deemed To Be In The Best Interest Of The City. Question Submission Close Date 2/1/2024 5:00 PM MST ENGINEER will transmit to all persons or agencies who have signed up to receive copies of the Bid Documents such Addenda as ENGINEER considers necessary in response to questions arising at the conference. The location of the work is: Victory (approx. 670 Victory Road, SLC, UT 84103), Bonneville (approx. 340 East Bonneville Blvd., SLC, UT 84103), Popperton Park (approx. 360 North Popperton Park Way, SLC, UT 84103), Emigration (approx. 2601 Sunnyside Ave, SLC, UT 84108). B. The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Installation of asphalt parking areas with concrete curb/gutter, retaining walls, sidewalks, bike racks, restroom facilities and related amenities.

Award

Sidewalks / Parking Lot

$1,290,000.00

Public - City

Paving, Site Work

57

12

6

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
543
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

March 29, 2024

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.