BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Fayetteville, Arkansas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The Fayetteville Middle School and/or Junior High School are key projects for the district. A completion date of April 2027 is expected. The district will select an architect to lead visioning, educational specifications, and project design. At this time, the full scope of the project is yet to be determined. Currently, it is assumed that at a minimum, the work will include the following Construction of a Fayetteville Middle School and/or Junior High School. Site development includes bus and parent drop-off, parking/circulation, access driveways, athletic practice field, track, and green space. The project may include other scopes of work related to the Fayetteville Middle School and/or Junior High School project location, if agreed upon between the district and the selected Architect. All costs incurred by the firms who choose to participate in the RFQ process shall be the responsibility of the proposing/submitting firms. The proposed scope of work for a Fayetteville Middle School and/or Junior High School is as follows Create a space with student and teacher needs and student learning as the first priority. Perform and provide top-quality pre-construction services that include value engineering, constructability reviews, cost estimating, scheduling, collaboration with the design consultants, logistics and phasing, site investigation and destructive testing, and assistance in selecting building materials and systems. Utilize and provide integrated construction technology including virtual design and construction. Aid in the establishment and achievement of high-performance construction and design goals. Aid in the feasibility of a Net Zero Building, including exploring the feasibility of ICF (Insulated Concrete Forms) construction. Manage and solicit subcontractor and supplier bidding. Ensure the delivery of the highest quality project, through top-notch construction services that ensure safety is the highest priority. Provide a project that is on time and under budget. New Middle School and/or a New Junior High School Equal Opportunity: the Fayetteville Public Schools Does Not Discriminate in Its Policies and Programs on the Basis of Race, Color, Creed, Religion, Age, Sex, Handicap, National Origin, or Ancestry.

Award

Educational

$400,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
40
Bidding Soon
527
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

img_map_placeholder

To Be Determined, Fayetteville, AR


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.