BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work and new construction of an educational facility in The Plains, Ohio. Completed plans call for the construction of a 151,000-square-foot, three-story above grade educational facility; and for site work for a educational facility.

As of August 12, 2025, construction has commenced and is expected to be completed in the first quarter of 2027. All trades are let and set for this project. *This project has been awarded and all trades have been let. *The closed solicitation has been included below for reference: Build one (1) New High School with approximately 99,651 co-funded SF and 38,408 Locally Funded (LFI) SF, to house 598 students (Total anticipated 138,059 SF.) The building will be located/constructed at the existing HS site, 1 Highschool Rd., The Plains, Ohio. The existing High School building will remain operational during construction and is located within close proximity to where the New HS building will be constructed. Total New HS Building Budget Cost: $53,315,298.00 (($38,042,660.00 Co-funded + $15,272,638.00 Locally Funded Initiative (LFI)). A Specific Allowance budget of $120,578 is included for an Emergency Responder Radio Coverage System and is included in the overall building budget above. A separate early site package GMP is anticipated and should be included as part of the AE Basic Services. It is anticipated to do an Early Site Package GMP when the 100% Design Development Documents are completed, or sooner. Anticipated to start the Early Site work construction May 2025. The Architect/Engineer ("A/E") will prepare the POR as part of their AE Basic Services. This project will be designed to LEED V4 requirements and will require Silver Certification. The project delivery method for this new High School building will be Construction Manager at Risk. Project Scope also includes work to abate and demolish the existing High School building, via Construction Manager at Risk Delivery Method, after occupancy is achieved and after the District has relocated their operations into the New High School building facility. Finalization of the remaining new sitework scope will be required once abate/demo scope related to the existing facility is completed. Abate/demo budget cost is $1,231,739. Question Deadline: 02/01/2024. Submit all questions regarding this RFQ in writing to Jill Hoobler procurement with the project Number It is desired to have the demo/abatement design completed at the same time as the New Building GMP documents. We would like to be able to negotiate and execute the Building GMP for the new Building and the D/A concurrently. The actual Abatement/Demolition work will commence approximately 4 weeks after vacating the existing buildings.

Award

Educational

$60,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
105
Bidding Soon
1,833
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 2, 2025

Project location map

1 High School Rd, The Plains, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.