BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2024 at 7:00 PM

Updated February 1, 2024

Site work for a bridge / tunnel in Garibaldi, Oregon. Conceptual plans call for site work for a bridge / tunnel.

Design - Engineering Design Services Culvert Replacement. Tep Will Award a Contract for All Work Necessary to Complete Phase I of the Project Consisting of: Completion of 2d Hydrodynamic Modeling, in-depth Alternatives Evaluation, and 30% Preliminary Design for the Two Culvert Replacements on Mary's Creek. The method of Contractor Selection has not been Determined at this time. Contract for Design Phase/Phase I expected to be completed by December 2024.

Conceptual

Bridges / Tunnels

$710,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,016
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

Project location map

To Be Determined, Garibaldi, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.