BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tigard, Oregon. Conceptual plans call for site work for a water / sewer project.

Based on recommendations from the 2018 Stormwater Master Plan, and results of the completed Tigard Triangle Stormwater Implementation Plan (CIP #94044), this project is first priority to implement from a series of projects needed along the full length of Red Rock Creek in Tigard. The project will create a sustainable creek, floodplain, and vegetated corridor cross section that can withstand and contain current and future predicted storm flows while providing habitat and shading for native fish and other species. It will protect and re-bury exposed sanitary sewer lines. Excess sediment deposited in the vicinity of SW Dartmouth will be removed and the stream and wetlands restored to reduce flooding and improve stream function. Some piped creek sections will be day lighted. The new creek corridor cross section will be designed to also accommodate as possible a future Red Rock Creek Trail. The project will be designed to meet Clean Water Services standards such that new and re-development in the Tigard Triangle and Hunziker areas may be able to reduce onsite stormwater detention requirements and instead pay a fee to provide some future reimbursement toward this and other Red Rock Creek projects. This project represents multiple projects initially identified in the 2018 Stormwater Master Plan (projects 502, 506, and part of project 501 adjacent to SW Dartmouth). The project is include in the city's 2023-2024 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,100,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
28
Bidding Soon
538
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

img_map_placeholder

11090 SW 68th Pkwy, Tigard, OR

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.