BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Splendora, Texas. Working plans call for site work for a water / sewer project.

As of 2/8/2024 no bids were received. This project will be rebid at a later date. Request for Proposals for a qualified firm to remove and replace an existing 125,000 gallon potable water ground storage tank. For additional details or to answer applicable questions, please contact Utility Supervisor Jeff Rich at 936-672-2373, or jrich@cityofsplendora.org. The Owner reserves the right to accept or to reject any bids, to waive technicalities, and to make any investigation deemed necessary concerning the bidder's ability to provide the product/service(s) required, and to accept what in its judgment is the most advantageous bid. During the period between the Request for Proposals or the Bid Solicitation, submission date, and the contract award, respondents including their agents and/or representatives/owners, shall not directly or indirectly promote their proposal or bid to any member of the Splendora City Council or City staff except in the course of City-sponsored inquires, briefings, interviews, and/or presentations requests. Violation of this provision may result in the rejection of the respondent's Proposal submittal. A. Dismantle all piping, plumbing, electrical, and monitoring structures or devices from the existing Ground Storage Tank. (GST). B. Evaluate existing gravel foundation and, based on GST provider's foundation requirements: a. Recommend to re-use existing gravel foundation if feasible or; b. Dismantle and remove existing foundation and install a new foundation as required by GST manufacturer. C. Install new bolt together 125,000 gallon galvanized steel GST or equivalent. D. Reconnect all piping, plumbing, electrical, and monitoring structures removed during demolition a. All valves and fittings are to be replaced with new. E. Clean and disinfect the newly installed GST. F. Clean up and restore work area to preexisting condition. Written requests must be received a minimum of five (5) calendar days prior to the submission deadline. Question Deadline 01/29/2024

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
80
Bidding Soon
2,786
All Active Projects
986
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2024

May 6, 2024

img_map_placeholder

14136 Old Hwy 59, Splendora, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.