Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 22, 2024

April 1, 2024

October 28, 2024

Award

Sidewalks / Parking Lot

$2,044,253.00

Public - City

Paving, Site Work

img_map_placeholder

Multiple Locations, Ardmore, PA

11

12

15

6

Subscribe to View Full Documents

Site work and paving for a mixed-use development in Ardmore, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 19, 2024, Project has been awarded. Award amount is $2,044,253.80** Scope of Work The Cynwyd Spur Trail Extension is to construct a multi-purpose public recreational trail connection from the Cynwyd Heritage Trail, through the former Connelly Property, across Norfolk Southern property, to the O'Neill Trail. The project is located at the Cleggs Lane Culvert under Norfolk Southern Harrisburg Line (Milepost HP-7.28). The work includes, but is not limited to, maintenance and protection of the existing bridge and superstructure; selective demolition; micropiles; cast-inplace reinforced concrete with galvanized corrugate steel plate arch structure; flowable fill; and site restoration. Award is planned for March 20, 2024, with Construction Notice to Proceed planned for April / May 2024 pending contract execution. Detailed specifications developed by the Pennoni Associates, Inc. Questions regarding the project scope shall be submitted via The last day for receipt of written questions is end of business day of February 9, 2024. The Board of Commissioners reserves the right to reject any or all bids or parts thereof or to waive any informality or irregularity as deemed to the best interest of the Township. Each Proposal shall be accompanied by a Bid Guaranty as specified in the Instructions to Bidders section of the Bid Document. 5. A Performance Bond and Labor and Materials Bond in the amount of 100% are required. Also, a Maintenance Bond in the amount of 25% is required.

73 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Starting At

  • One License and data in one market (additional available after purchase)
  • Full access to bidding and planning projects’ details, documents and contacts
  • Comprehensive planholders list coverage on bidding projects
  • Additional licenses and project data across multiple markets available

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Don't miss Bidding Projects!

Within 75 Miles of this Project:
788
Active Projects
418
Bidding Soon