BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and new construction of a pre-engineered storage facility in Oak Park, Michigan. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of April 17, 2025, this project had been completed by March 1, 2025. No further information is expected. The previous solicitation is listed below for reference. Sealed bids for Berkley School District consisting of a new Pre-Engineered Building and related site work to be located at Berkley School District Administration Building site. This Bid Package will consist of separate sealed bids for the following Bid Divisions: 101: Earthwork & Site Utilities 102: Asphalt Paving & Site Concrete 105: Interior Concrete Flatwork 107: Miscellaneous Steel 108: Carpentry & General Trades 115: Metal Studs/Drywall/Acoustical Treatment 116: Hard Tile 118: Resilient Flooring 120: Painting 140: Plumbing 141: Fire Protection 142: Mechanical 143: Electrical 149: Fencing 174: Pre-Engineered Metal Building Systems All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Berkley School District, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance, Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a contract, the successful bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price. Berkley School District reserves the right to reject any or all bids received, to waive any informalities and irregularities in the bidding, and to accept a bid other than the lowest bid.

Occupancy

Warehouse / Distribution - Pre-Engineered Storage Building

$300,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
137
Bidding Soon
2,544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

May 24, 2024

Project location map

14501 Talbot St, Oak Park, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.