BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2024 at 7:00 PM

Updated February 20, 2024

Site work for a water / sewer project in Jemez Springs, New Mexico. Completed plans call for site work for a water / sewer project.

Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions. Working time for this Contract is Ninety (90) calendar days. Time will be counted from the date of Notice to Proceed. The Owner reserves the right to accept or reject any or all Proposals or Bids, to waive technicalities, to make any investigation deemed necessary of a Bidder's ability to perform the work covered by the Specifications, and to accept what in the judgement of the Owner is the best bid. the Jemez Springs Domestic Water Association Office in Jemez Springs, NM for a unit price contract for construction of the Phase 3 Water System Improvements Project. The project involves the construction of a replacement pressure relief valve (PRV) vault structure, a new 8" diameter Class C-900 PVC water main along the west shoulder of NM State Road 4 in Jemez Springs, New Mexico including trenching, pipe installation, fittings, water valves, fire hydrants, service laterals, water meters, connections to existing water lines, backfill, compaction and site restoration.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
19
Bidding Soon
363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 1, 2024

Project location map

NM-4, Jemez Springs, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.