BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a religious / funeral development in Beaver Dam, Kentucky. Completed plans call for the renovation of a religious / funeral development.

The project consists of eliminating approximately 6 acres of acid pits with a highwall spanning 2100 linear feet. The pits will be backfilled with onsite mine spoil material at slopes no steeper than 4:1 with transitions as required. Blasting will not be permitted. The water in the pits will be treated and raised to a pH of 6 or greater prior to release and backfilling of the pit in accordance with KYDAML Technical Specifications. Work for this project will involve the removal of trees measuring over 3"-inches in diameter at breast height (DBH) at the project location outside of exempt unstable areas and this cutting shall occur from October 15th-March 31st, when the imperiled forest-dwelling bats-are either within or in the immediate vicinity of their winter hibernacula. The clearing of trees over 5" DBH, which also display characteristics such as shaggy, exfoliating bark, or crevices and hollowed-out cavities within their trunks and larger limbs is also required outside of the exempt unstable areas, and consultation with United States Fish and Wildlife Service (USFWS) has taken place. The USFWS stated no problems should arise if tree cutting is done within the recommended window

Bid Results

Religious / Funeral

$887,938.00

Public - State/Provincial

Renovation

13

9

2

9

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
19
Bidding Soon
651
All Active Projects
259
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

February 29, 2024

img_map_placeholder

1537 KY-269, Beaver Dam, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.