BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Apple Valley, California. Completed plans call for the renovation of a playground / park / athletic field.

Reference Number 0000350749 The Project generally consists of providing the labor, equipment, and materials for the renovation of ball fields 1-9 at James A. Woody Park. The Contractor will be responsible for the furnishing of materials, sitework, and renovation of nine (9) existing ballfields. The selected Contractor shall be responsible for all removals, hauling of the existing materials if needed, renovation of existing ballfields, and all other tasks required per specifications indicated in this document. Field dimensions and specifications are included in Exhibit "B". Work on the Project shall be completed within 45 working days, and work must be completed no later than August 14, 2024. The tentative projected award date is May 28, 2024. There will be a pre-construction meeting held on or about May 30, 2024, and mobilization shall occur on or about June 10, 2024. Job Location 13467 Navajo Rd., Apple Valley, CA 92308 Question Deadline 05/08/2024 at 1:00 PM PT Questions are submitted online No. Questions can be sent by email to Danielle Smith at dsmith@applevalley.org CONTRACTOR'S LICENSE: Each Bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: A or C 27. Bids must be accompanied by cash, a certified or cashier's check, or a Bid Bond in favor of the Town in an amount not less than ten percent (10%) of the submitted Total Bid Price. The successful Bidder will be required to furnish the Town with Payment and Performance Bonds equal to 100% of the Contract Price, prior to execution of the Contract. *The Town reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. COST ESTIMATE: $535,000-$585,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$585,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
114
Bidding Soon
2,008
All Active Projects
944
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

June 17, 2024

img_map_placeholder

13467 Navajo Rd, Apple Valley, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.